FOB Price
Get Latest Price|
Minimum Order
Place of Origin:
China
Price for Minimum Order:
-
Minimum Order Quantity:
1 Set
Packaging Detail:
iron frame
Delivery Time:
30 days
Supplying Ability:
-
Payment Type:
T/T, L/C
連絡先担当者 Emily
Xintai, Shandong
Bottle specification
|
Bottle outside diameter
|
****4mm
|
Bottle height
|
******0mm
|
|
Production capability
|
|
********0 b/h
|
Lnner layer washing
machine
|
Main motor power
|
1.1kw
|
Inside washing motor
|
0.*5kw
|
|
Inside washing motor
|
**5r/min
|
|
Pressure of water
supplying
|
0.**0.4Mpa
|
|
Bottle feeding speed
|
7.*4m/min
|
|
Driver plate speed
|
7.*8r/min
|
|
Outer size
|
***0×***0×***0mm
|
|
Weight
|
***0kg
|
|
Outside remove labeling
machine
|
Orbit motor
|
0.*5kw
|
Orbit speed
|
*1.*3r/min
|
|
Outside washing motor
|
0.*5kw
|
|
Water pump motor
|
0.*7kw
|
|
Water consumption
|
2.8m3/h
|
|
Outer size
|
***0×**0×***0mm
|
|
Weight
|
**0kg
|
|
Steeper
|
Liquid temperature
|
****5oC
|
Solution concentration
|
1.4%
|
|
Outer size
|
***0×***0×***0mm
|
|
Weight
|
**0kg
|