FOB Price
Get Latest Price350 / Set
|Minimum Order
Place of Origin:
Chongqing China
Price for Minimum Order:
Minimum Order Quantity:
1 Set
Packaging Detail:
Carton
Delivery Time:
15days
Supplying Ability:
10 Set per Day
Payment Type:
T/T, L/C
連絡先担当者 Wallace
Gele moutain,shapingba Area,Chongqing.China, Chongqing, Chongqing
YJY*8m
Material: |
organic waste including liquid and so... |
Maintain: |
easy to maintain |
Service Lifetime: |
Durable |
Cost: |
Very cheap |
Family size YJY biogas system has the flowing FEATURES:
1.EASY AND QUICK TO BE BUILT
The construction of YJY family size biogas system is exempt from the difficult airtight craft, so the technical difficulty is greatly decreased, and the construction period is greatly shortened. To build a YJY Biogas Digester successfully, the constructers are only required to master how to assemble and disassemble the steel mould. Any workman can learn to build YJY family size biogas plant within a day and with **0% success rate.
2. High reliable
The steel mould and the glass fibre reinforced plastic gasholder can be mass-produced in factories, so that any place or country can build the Puxin Biogas Plant
3. Solid organic material(straw and grass etc.) can be used
4. Easy to maintain
When the gasholder is leaking, the leak can be found immediately, and can be repaired on ground.
5. Durable
The concrete digester can last over *0 years, and the glass fibre reinforced plastic gasholder over *0 years. When the gasholder is worn out, a new one is replaceable,so that the biogas plant can last over *0 years.
6. Excellent safety feature
When the gasholder is taken out, no biogas is left in the digester. The digester neck (1.5m in diam) is large enough to keep sufficient fresh air in the digester. So it is safe both to repair the digester inside and to replace fermentation material . When the gas pressure reaches its limit, there will be automatic gas leak, hence no damage to the plant.
7. Low cost
The YJY Biogas Plant is composed of a concrete digester that is built with a steel mould provided by us, a glass fibre reinforced plastic gas-holder and a concrete or glass fibre reinforced plastic cover. The digester is 6 or *0 m3 of capacity.