FOB Price
Get Latest Price30000 ~ 32000 / Piece ( Negotiable )
|Minimum Order
Place of Origin:
China
Price for Minimum Order:
Minimum Order Quantity:
1 Piece
Packaging Detail:
polybag
Delivery Time:
60days
Supplying Ability:
365 Piece per Year
Payment Type:
T/T, L/C
連絡先担当者 Mr. Amiko
jiyang lake crown plaza, zhangjiagang, Other
1.Products regulation:**0—**0mm
2.Speed: *2m—*5m/min(without cutting,punching time)
3.Roller:*5
4.Roller material: Cr*2( HRC****2)
5.Shaft Material: *5, shaft diameter *5mm
6.Main power: *8.5Kw
7.Hydraulic station:7.5Kw
8.Hydraulic station pressure: *5 Mpa
9.Control System: PLC
*0.Dimension:****0×***0×***0mm
*1. cutting material: Cr*2Mov
*2 Thickness:2.5—4mm
*3 Length:*0m**2mm
*4 Double Chain
Designed by Customer’s requirement