FOB Price
Get Latest Price100000 ~ 200000 / Piece
|Minimum Order
Place of Origin:
sanli
Price for Minimum Order:
Minimum Order Quantity:
1 Set
Packaging Detail:
NAKED
Delivery Time:
10 days
Supplying Ability:
20 Set per Month
Payment Type:
T/T, L/C, Other
連絡先担当者 Ms. Jessie
Baotong, Weifang, Shandong
  | Item | Unit | Technical parameters | |
  | (Discharge Capacity) | L | ***0 | |
  | (Charge Capacity) | L | ***0 | |
  | (Mixing Time) | s | ****5 | |
JS***0 | (Rated Output) | M3/H | **0 | |
Mixer | (Motor Power) | (kw) | *7x2 | |
  | (Hoisting power) | (kw) | *7 | |
  | (Pump power) | (kw) | 5.5 | |
  | (Max diameter of aggregates gravel/crushed stone) |   |   | |
  |   | (mm) | ||
  | (Overall Dimension) | (mm) | ***0X***0X***5 | |
  | (Total Weight) | kg | ***0 | |
  | (Storage Bin Capacity) | m3 | *5x4 | |
  | (Weigher Capacity) | L | ***0 | |
PL***0 | (Motor Power) | kw | 4 | |
  | (Vibrating Motor ) | kw | 0.3 | |
Four Batching | (Overall Dimension) | mm | ****0X***0X***0 | |
  | (Total Weight) | kg | ****0 | |
  | (Type) |   | LSJ*0 | |
  | (Conveyor Length) | mm | *1 | |
  | (Screw Turning Speed) | r/min |