FOB Price
Get Latest Price3010 ~ 5890 / Piece
|Minimum Order
Place of Origin:
China
Price for Minimum Order:
Minimum Order Quantity:
1 Set
Packaging Detail:
Export standard Wooden case
Delivery Time:
10-20 days
Supplying Ability:
100 Set per Week
Payment Type:
T/T, L/C, Western Union
連絡先担当者 Mr. Gary
No. 253, Xuanchun road, Sanzao industrial park, Pudong r, Shanghai, Shanghai
One. The heating way and technical parameterof teppanyaki equipment
  1.Electric magnet (more advanced and environment-friendly heating way, the main heating area can reach **0 degree Celsius within 3 minutes through electric magnet.)
  Electricity index: **0V/*0HZ 7.5KW , single- fase three- wire system
  2.Electric heating pipe
  Electricity index: **0V/*0HZ 7.5KW, three-phase and five-wire system
  3.Fuel gas (coal gas, liquified petroleum gas, natural gas)
  Coal gas consumption: 9’caloric value ****0 2.*2 m3 /h
  liquified petroleum gas consumption: 9’caloric value ***0 0.*5kg /h
  Natural gas consumption: 9’ caloric value ****0 1.2 m3 /h
Two. Overal equipment effectiveness
Three. Monolithic/iron plate material Alloy Steel , thickness *0 mm, no deformation
Four. Surface processing: heat treatment - planing process - grinding, the bottom of the surface of the iron plate does not require any process, and the iron plate will reach a certain temperature in the shortest time after a special heat treatment of the surface.
Five. Ventilation system needs ***0m3 /h air volume, usually exaust duct is installed outdoors, if there is not convenient to install exhaust duct outdoors, you can install purifying machinery and air blower with the cleaning efficiency of over *5% can be set in place of exhaust duct.