あなたはまだ TradeKey.com のメンバーではないようです。 今すぐサインアップして、世界中で700万を超える輸入業者および輸出業者と接続します。
今すぐ加入、無料 |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
scrap plastic pyrolysis to diesel machine

scrap plastic pyrolysis to diesel machine

FOB Price

Get Latest Price

36000 ~ 48000 / Set ( Negotiable )

|

Minimum Order

Place of Origin:

china

Price for Minimum Order:

Minimum Order Quantity:

1 Set

Packaging Detail:

container and flat rack

Delivery Time:

15days

Supplying Ability:

25 Set per Month

Payment Type:

T/T, L/C

今すぐお問い合わせください
無料会員

連絡先担当者 Mr. David

daozhaoying, Xinxiang, Henan

今すぐお問い合わせください

Description

1. Specification of Reactor

capacity

Size ( Diameter * Length)

   Thickness

    Material

5 tons

***0mm****0mm

   *4 mm 

**5R boiler steel

8 tons 

***0mm****0mm

    *4 mm

*0 tons

***0mm****0mm

    *6mm

 

2. Main Features

(1). Safety 

a. The waste gas produced during the process is alkyl from C1 to C4, which is dangerous when burning directly. 

   In our process, it is firstly transferred through waste gas recycle system and a safe device spray gun. Before burning, we should ensure the safety of production.

b. Pressure gauge, alarming device and safety valve.

 (2). Environmental Protective

 a. Effective water dedusting system can avoid black smoke.

b. The exhaust gas will be recycled for heating reactor to save energy and no pollution. 

c. Every junction of the reactor is in good sealing situation with professional sealing material.

d. Waste solid. The solid residua will be left in the reactor. Its main component is black carbon. It can be the raw material industrial black carbon. Also could be mixed with the pulverized coal ash as raw material in thermal power plant, also could be the raw material of pulverized coal ash brick (one kind of environmental protective building material).

 

3.Usage of Crude Oil

A.power plant factory

B.glass factory

C.cement factory

D.ceramic factory

E.aluminum factory

F.boiler factory

G.central heating factory

H.painting factory

 

4.Delivery time: *0 days after receiving the advance

5.Warranty period is whole life. 

6.We have office in India to improve our after-sales service. 

Send a direct inquiry to this supplier

To:

Mr. David < xinxiang jinzhen manufacture co., ltd >

私は知りたい: