FOB Price
Get Latest Price2600 ~ 2700 / Tonne
|Minimum Order
Place of Origin:
China
Price for Minimum Order:
Minimum Order Quantity:
1 Tonne
Packaging Detail:
standard
Delivery Time:
20 days
Supplying Ability:
200000 Tonne per Year
Payment Type:
T/T, L/C
連絡先担当者 Mr. Chen
JiuGuan Town, Huzhou, Zhejiang
FuGang Stainless steel wire rod
Stainless steel grade: **4, **4ES,**4L, ER**8,**4H, **4MD,**6,
**6L, D**7 etc.
Wire rod Diameter:5.5mm, 6.5mm, 7.5mm. 8mm, 9mm and 9.5mm
The main equipments we have
A. 1 Rated *5 tons Electric Arc Furnace + AOD
Furnace + Annealing furnace + Die casting device for
stainless steel making with annual Max output up to *****0
tonnes
B. 1 Rated *5 tons Electric Arc Furnace + LF Furnace
+VD Furnace + annealing furnace + ESR furnace for alloy steel
making with annual Max output up to **0,**0 tonnes
C. 6 Rated *5 tons Intermediate Frequency Furnace for
carbon steel making with annual Max output up to **0,**0 tonnes
D. Φ**0 rolling mill , Φ**0 rolling mill , Φ**0 rolling
mill
3. The products we import
A. High carbon ferrochrome or charge chrome
B. Scrap of stainless steel
In addition, we are only 2 hours driven far away from Shanghai
Pudong Airport and 1.5 hours driven from Hangzhou Airport, thus,
you visit will be warmly welcomed