FOB Price
Get Latest Price( Negotiable )
|Minimum Order
Place of Origin:
China(Mainland)
Price for Minimum Order:
-
Minimum Order Quantity:
1 Set
Packaging Detail:
wooden case
Delivery Time:
30 days
Supplying Ability:
1500 Set per Year
Payment Type:
T/T, Western Union, Money Gram, PayPal
連絡先担当者 jane
No.31 Cuibai Road ,Chunhui Street, Chongqing, Chongqing
The main components of equipment are installed in the steel plate housing with waterproof structure, out of the port flange is set in the side of the housing.It is easy to install and manage. Line oil filter is formed by the suction tube and pump, a filter tank and the drain line. Load tap indoor insulating oil under the action of the pump suction tube and sent to the filter tank to the pump under pressure through the filter tank filter, filter drain line returns after the load tap room.