あなたはまだ TradeKey.com のメンバーではないようです。 今すぐサインアップして、世界中で700万を超える輸入業者および輸出業者と接続します。 今すぐ加入、無料 |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
Sell car parts

Sell car parts

FOB Price

Get Latest Price

0.5 ~ 15 / Piece

|

Minimum Order

Place of Origin:

Make In China

Price for Minimum Order:

Minimum Order Quantity:

2000 Piece

Packaging Detail:

carton

Delivery Time:

within 7 days

Supplying Ability:

2000 Piece per Day

Payment Type:

T/T, L/C, D/A, D/P, Western Union, Money Gram, PayPal, Other

今すぐお問い合わせください
無料会員

連絡先担当者 Mr. nana

No. 362, Shanfeng Street, Ciwu Town ,Zhuji City,, Shaoxing, Zhejiang

今すぐお問い合わせください

Description

 

Specification

 

1) Many kinds available

2) Main material: *0Si2MnA, *5CrSi and other material alternative

3) Used in bonnell spring nets and spring mattresses

4) Main size: φ8 - *6.0mm

5) Top dia of spring: *****6mm

6) Height of spring:******0mm

 

Superiority

 

1. Zhejiang university heat treatment experiment base

2. China's largest brake springmanufacturer

3. The *0% domestic market share in brake spring.

5. Our company’s heat treatment technology measure up to advanced world standards by means of introducing Zhejiang University advanced heat treatment equipment. They’re the same as Japanese and Germany equipment.

6. High quality and competitive price

7. The Spring absorb shake and makedrive comfortably

8. The Spring resistance to both highand low temperature

9. High quality spring, everyproduct-spring needs to do many tests. For example, tensile strength, fatiguelifetime, static press, dynamometry salt mist and so on.ALTOKY TOYOTA COROLLASALTOKY TOYOTA COROLLASALTOKY TOYOTA COROLLASALTOKY TOYOTA CO

 

Terms and conditions

Sample lead time:**3days

Production lead time:**7days

Payment term: *5% prepaid before production, the balance should be paid before shipmentother payment terms can be discussed.

Shipping term: FOB, CIF or other shipping terms can be discussed.

How to place an order

 

 

 

1.You send us your drawings or sample

2.We provide you an exact quote

3.When confirming our price, we prepare the first article

4.After confirming our sample, you place an order

5.Begin mass production after receiving *5% down payment

6.Deliver the goods after receiving the balance

 

Remarks:

ROLLAS Remarks: ALTOKY TOYOTA COROLLA

 

1 .MOQ:***0pcs (Negotiate)
2. Delivery time :within 7days
3. Payment terms:*0% prepaid before production, the balance should be paid before shipment
4. Warranty: 3 Months from the day when you receive the goods
 
If you have needs , Could you provide


your drawings?
 
1.Wire diameter (d)
2.Outside of diameter (O.D)
3.Free height
4.Active coil Number (Na)
5.material, quantity
 
Contact us asap .Thank you.

Tel:**********0

Email:anna(at)akspring.com

Send a direct inquiry to this supplier

To:

Mr. nana < Zhuji Angke Spring Factory >

私は知りたい: