FOB Price
Get Latest Price( Negotiable )
|Minimum Order
Place of Origin:
Shandong,China
Price for Minimum Order:
-
Minimum Order Quantity:
-
Packaging Detail:
-
Delivery Time:
Within 15 days on receipt of deposit
Supplying Ability:
-
Payment Type:
L/C, T/T
連絡先担当者 Mr. Eric
Wanlin Industrial Park, Hedong District,, Linyi, Shandong
1. Typical Application:
l Highways
l Railways
l Car parks
l Access roads
l Cycle ways and footpaths
2. Feature:
l Can withstand construction installation stresses
l UV (Ultra Violet) Stabilized
l High Chemical Resistance
l Optimum Elongation
3. Specification
l Mass per unit area: **0 g/m2—***0 g/m2
l Width: 1 m—6.6m
l Length: *0m—**0m
l Thickness: 0.5mm—*0mm
l Other Weights available. Custom-made roll widths and lengths are also available.