FOB Price
Get Latest Price( Negotiable )
|Minimum Order
Place of Origin:
Jiangsu China
Price for Minimum Order:
-
Minimum Order Quantity:
1 Set
Packaging Detail:
guild regulations
Delivery Time:
180 days
Supplying Ability:
-
Payment Type:
L/C, T/T
連絡先担当者 Ms. hongmei
industry area, Huaian, Jiangsu
The annual output of *****0 cubic aerated concrete production
line mainly has: Material handling equipment, ingredients pouring
equipment, static stop cutting equipment, marshalling maintenance
equipment, finished out the reactor equipment, dust removal process
equipment, electrical equipment and other related equipment, with a
high degree of automation, easy operation, high yield etc...The use
of air cutting technology, the distributed cutting machine (
cutting machine ) can cut 6 meters bad body, cutting process (
flip, slitting, die ) respectively in different work completed, and
cutting, walking control in the same device, so that the work can
be simplified, easy to operate and maintain.
Aerated concrete block production process
Aerated concrete equipment based on the raw materials category,
quality, main process characteristics, adopt the different
production process. But in general, the fly ash or sand adding
water into a slurry, adding proper amount of powdered lime, cement,
gypsum and a foaming agent, stirring after injection into the mold
frame, static oxygen blowing after curing, cutting into a variety
of specifications block or plate, by steam curing car into the
autoclave in high temperature saturated steam curing condition, in
the that the formation of porous light aerated concrete
products.
Aerated concrete equipment production line of
According to the raw material category, quality, main process
characteristics, adopt the different production process. But in
general, sand aerated concrete is the river sand, lime, gypsum and
cement as main raw material, foaming agent, stirring after
injection into the mold frame, static oxygen blowing after curing,
cutting into a variety of specifications block or plate, by steam
curing car into the autoclave in high temperature saturated steam
curing condition, in the form porous light sand aerated concrete
products.
The annual output of *****0 cubic aerated concrete equipment
configuration table
A raw material treatment equipment.
1 hopper 1
2 jaw crusher ( lime ) 1 PEF**0 x **0
3 crushing machine chute 1
4 Bucket Elevator 1 IF4S x *1.*5m
5 Bucket Elevator 1
6 corpus 1 Φ4.5× 8
7 manual screw gate 1 **0 x **0
8 vibration feeder 1 Φ**0
9 ball mill ( lime ) 1 Φ***0× ***0
*0 screw conveyor 1 Φ**0× S
*1 Bucket Elevator 1 IF3S x *2m
*2 bucket elevator chute 1
*3 Manual disc brake 3
*4 discharge pipes 1
*5 slurry mixing tank 2 *0m3
*6 supplementary tank 1 V = 1m3
*7 pneumatic blowing device 3
*8 1 CD*1T electric hoist
Two ingredients a pouring station equipment.
1 slurry meter 1 G = **0kg
2 slurry meter 1 Q = ***0kg
3 aluminum mixer 1 V = 0.**2m3
4 electronic scales 1 ACS**5.*5kg
5 single screw feeder 1 Φ**0× 6m
6 casting mixer 1 V = 3.6m3
7 a ferry vehicle 1
8 1 CD*2T electric hoist
Three static stop cutting process equipment.
1 mold *5 4.8 x 1.2 x 0.6
2 side plate **0 4.8 x 0.6
3 steam curing car *0 4.8 x 1.2 x 0.6
4 slow-motion hoist 2 JJM
5 guiding wheels 5
6 cutting and conveying mechanism 1 2 x 5.0t
7 reversal hanger 1
8 Distributed cutting unit 1 6m
9 beater ( shell ) 1 5.6m3
*0 slurry pump of 1 *0YZ****0
*1 side plate roller *2
Four. Equipment maintenance section marshalling
1 yards of blank conveying mechanism 1 2 x 5T
2 semi-finished spreader 1
3 vacuum pump 1 2SZ*6
4 kettle bridge 2 stations
5 autoclave 8 Φ2.*8× *1.5m
6 waste water pool 1
7 liquid pump of 1 *0YW*0
Five finished product tank section equipment.
1 electric hoist ( including frame ) 1 ZDS1P = 5T
2 out of 1 sets of autoclave spreader
3 out of 1 sets of tank car ferry
4 finished fixture 1
5 hydraulic turning plate 1
6 light rail track 1 *8 #
The six section. Dust removal equipment
1 jaw broken single dust collector 1 DMC**8
2 warehouse roof ESP 3 HYF*2
3 mill outlet dust collector 2 LDMS*0
The seven heating power pipeline. |
1 boiler of 3 SZL*1.6A II – 4 |
2 row tube radiator *4 D*9 |
3 meter 1 A Niu DN**5 |
4 Thermodynamic type steam trap 4 S*9H |
5 cylinder 3 ø **0,   ø **0 |
6 air compressor 1 LGFD*2 / 0.*-X |
7 various types of pipeline valves |
8 kettle pipe insulation |
Electrical equipment eight. |
1 batching control system |
2 low voltage control cabinet |
3 lighting system |
4 each tube cable |
5 mating system |
Production workshop |
1 workshop of *4M * *3M * 9M ( L, W, H ) **2 square meters |
2 *6M * 3.5M * 2M convalesce workshop ( L, W, H ) **0 square meters |
3 boiler room *6M x *3M = **8 square meters |
4 powder workshop *7M x *0M = **0 square meters |
5 batching plant *0M x 7M x 3M ( L, W, H ) **0 square meters |
The seven heating power pipeline. |
1 boiler of 3 SZL*1.6A II – 4 |
2 row tube radiator *4 D*9 |
3 meter 1 A Niu DN**5 |
4 Thermodynamic type steam trap 4 S*9H |
5 cylinder 3 ø **0,   ø **0 |
6 air compressor 1 LGFD*2 / 0.*-X |
7 various types of pipeline valves |
8 kettle pipe insulation |
Electrical equipment eight. |
1 batching control system |
2 low voltage control cabinet |
3 lighting system |
4 each tube cable |
5 mating system |
Production workshop |
1 workshop of *4M * *3M * 9M ( L, W, H ) **2 square meters |
2 *6M * 3.5M * 2M convalesce workshop ( L, W, H ) **0 square meters |
3 boiler room *6M x *3M = **8 square meters |
4 powder workshop *7M x *0M = **0 square meters |
5 batching plant *0M x 7M x 3M ( L, W, H ) **0 square meters |
The seven heating power pipeline.
1 boiler of 3 SZL*1.6A II - 4
2 row tube radiator *4 D*9
3 meter 1 A Niu DN**5
4 Thermodynamic type steam trap 4 S*9H
5 cylinder 3 <</span> **0, <</span> **0
6 air compressor 1 LGFD*2 / 0.*-X
7 various types of pipeline valves
8 kettle pipe insulation
Electrical equipment eight.
1 batching control system
2 low voltage control cabinet
3 lighting system
4 each tube cable
5 mating system
Production workshop
1 workshop of *4M * *3M
* 9M ( L,
W, H )
**2 square meters
2 *6M * 3.5M * 2M convalesce workshop ( L, W, H ) **0 square meters
3 boiler room *6M x *3M = **8 square meters
4 powder workshop *7M x *0M = **0 square meters
5 batching plant *0M x 7M x 3M ( L, W, H ) **0 square meters