FOB Price
Get Latest Price( Negotiable )
|Minimum Order
Place of Origin:
china
Price for Minimum Order:
-
Minimum Order Quantity:
1 Ton
Packaging Detail:
standard seaworthy packing
Delivery Time:
20days
Supplying Ability:
500 Ton per Month
Payment Type:
T/T, L/C
China
連絡先担当者 Ms. linda
caoan, Shanghai, Shanghai
Commodity (info#forever-metal#com) | stainless steel sanitary tube |
Material: | TP**4, TP**4L,
TP**1, TP**6L, TP**6/**6L TP**7L, TP**1,TP**7etc. |
O.D.XW.T.(mm) | (*9.1~**8.3)x(0.*9~3.*5) |
Process method: |
cold drawn/cold pilgered |
Surface finish: |
annealed/cold pilgered/manual polished/ mechanical polished |
Standards: | ASTM A **0 ,DIN****0 |