FOB Price
Get Latest Price( Negotiable )
|Minimum Order
Place of Origin:
China
Price for Minimum Order:
-
Minimum Order Quantity:
1 Piece
Packaging Detail:
1.Large OD: in bulk 2, Small OD: Packed by steel strips 3, According to customers' requirement
Delivery Time:
15-30days after receiving your deposit
Supplying Ability:
6000 Ton per Month
Payment Type:
T/T, L/C
連絡先担当者 Ms. zhang
yanshanxihuan, Cangzhou, Hebei
O.D |
O.D tolerance |
W.T |
OD Tolerance |
*****8 mm |
±0.5mm |
1.***6 MM |
±0.3mm |
Length |
***2M , according to customers' requirements |
||
Standard |
BS***7;ASTM A*3;GB/T***1;EN*9;BS***8
|
||
Zinc Coating |
****0g/m2 for pre-galvanized pipes ******0g/m2 for hot dip galvanized pipes |
||
Packing |
Standard PVC bags pacaging with lifting belts Or according to customer's requirement |
||
Usage |
For construction, Low-pressure Pluid service and Greenhouse |
||
Productivity |
****0Ton/Month |
||
Processing |
1) galvanzied,inner and outer stab clean,bevelled 2) threading,with coupling and plastic caps protected 3) packing in plastic cloths,3PE,FBE,corrosion resistant coating |
||
Remarks |
1)Payment term : T/T, L/C, D/P 2)Trade Terms : FOB / CFR / CIF 3)Minimum quantity of order:*5 MT 4)Delivery period :*5 to *0 Days . 5)Special order is acceptable |
O.D |
O.D tolerance |
W.T |
OD Tolerance |
*****8 mm |
±0.5mm |
1.***6 MM |
±0.3mm |
Length |
***2M , according to customers' requirements |
||
Standard |
BS***7;ASTM A*3;GB/T***1;EN*9;BS***8
|
||
Zinc Coating |
****0g/m2 for pre-galvanized pipes ******0g/m2 for hot dip galvanized pipes |
||
Packing |
Standard PVC bags pacaging with lifting belts Or according to customer's requirement |
||
Usage |
For construction, Low-pressure Pluid service and Greenhouse |
||
Productivity |
****0Ton/Month |
||
Processing |
1) galvanzied,inner and outer stab clean,bevelled 2) threading,with coupling and plastic caps protected 3) packing in plastic cloths,3PE,FBE,corrosion resistant coating |
||
Remarks |
1)Payment term : T/T, L/C, D/P 2)Trade Terms : FOB / CFR / CIF 3)Minimum quantity of order:*5 MT 4)Delivery period :*5 to *0 Days . 5)Special order is acceptable |
O.D |
O.D tolerance |
W.T |
OD Tolerance |
*****8 mm |
±0.5mm |
1.***6 MM |
±0.3mm |
Length |
***2M , according to customers' requirements |
||
Standard |
BS***7;ASTM A*3;GB/T***1;EN*9;BS***8
|
||
Zinc Coating |
****0g/m2 for pre-galvanized pipes ******0g/m2 for hot dip galvanized pipes |
||
Packing |
Standard PVC bags pacaging with lifting belts Or according to customer's requirement |
||
Usage |
For construction, Low-pressure Pluid service and Greenhouse |
||
Productivity |
****0Ton/Month |
||
Processing |
1) galvanzied,inner and outer stab clean,bevelled 2) threading,with coupling and plastic caps protected 3) packing in plastic cloths,3PE,FBE,corrosion resistant coating |
||
Remarks |
1)Payment term : T/T, L/C, D/P 2)Trade Terms : FOB / CFR / CIF 3)Minimum quantity of order:*5 MT 4)Delivery period :*5 to *0 Days . 5)Special order is acceptable |
O.D |
O.D tolerance |
W.T |
OD Tolerance |
*****8 mm |
±0.5mm |
1.***6 MM |
±0.3mm |
Length |
***2M , according to customers' requirements |
||
Standard |
BS***7;ASTM A*3;GB/T***1;EN*9;BS***8
|
||
Zinc Coating |
****0g/m2 for pre-galvanized pipes ******0g/m2 for hot dip galvanized pipes |
||
Packing |
Standard PVC bags pacaging with lifting belts Or according to customer's requirement |
||
Usage |
For construction, Low-pressure Pluid service and Greenhouse |
||
Productivity |
****0Ton/Month |
||
Processing |
1) galvanzied,inner and outer stab clean,bevelled 2) threading,with coupling and plastic caps protected 3) packing in plastic cloths,3PE,FBE,corrosion resistant coating |
||
Remarks |
1)Payment term : T/T, L/C, D/P 2)Trade Terms : FOB / CFR / CIF 3)Minimum quantity of order:*5 MT 4)Delivery period :*5 to *0 Days . 5)Special order is acceptable |