あなたはまだ TradeKey.com のメンバーではないようです。 今すぐサインアップして、世界中で700万を超える輸入業者および輸出業者と接続します。 今すぐ加入、無料 |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
gold mining

gold mining

FOB Price

Get Latest Price

1.0E+13 /

|

Minimum Order

Place of Origin:

999999999999

Price for Minimum Order:

Minimum Order Quantity:

100000000000

Packaging Detail:

-

Delivery Time:

-

Supplying Ability:

99999999999

Payment Type:

-

今すぐお問い合わせください
無料会員

連絡先担当者 Mr. Raziman

jalan kemuning damai, Shah Alam, Selangor

今すぐお問い合わせください

Description

Environmental Management Plan (EMP) For Proposed Mining Operation At Lot ***5, Mukim Kuala Nal, Batu Menkebang District, Kuala Krai, Kelantan, malaysia. contain **4.*0 ha or **4.*9 acres. - Seeking for Fund from Investor The proposed plan is either buy entire this mining operation project license for RM*5 million net price or by Joint Venture with Zastara Sdn Bhd for this mining operation, with down payment deposit of RM*2 million from total operation cost need of RM*5 million. The return of gold mining trading later will be distribute by *0% to investor and *0% to owner which include *7.5% tribute to Kelantan government. Other terms and conditions are subject to negotiation meeting later. The gold grade as analyze is 1.*6 g/m3. The proven gold reserves contain is about ***0 kg + or 4 tan. Estimated mining activity for a year can produce up to ***8 kg, with estimate return on investment (ROI) of RM*5, **0, **0 x *2 months = RM**4, **0, **0 for 1st year, with production capacity of 3.2 kg per day x average estimate price of RM**0 per gram = RM**2, **0 per day. Therefore production per month can be RM**2, **0 x *0 days = RM*5, **0, **0, means investor can break even capital within 1st month if just buy over these mining operation license for RM*5, **0, **0, or about 5 months if seek for joint venture and incur total operation cost of RM*5, **0, **0. Investor can choose to just direct buy over with RM*5 million if already have own machineries and equipment to mine the gold. In summary forecast Return on Investment can produce for the entire 3 years is RM**6, **5, **7, after deduct operation cost whilst its net worth will be (RM**6, **5, **7.*4 âï¿&frac*2;ï¿&frac*2; RM*5, **0) = RM**1, **5, *9 Interest investor, please write in Letter of Intent (LOI), Address to Zastara Sdn Bhd and CC. To Alvin Tiong Sie Yun & Raziman Bin Azmi, then direct email to ***** or can call direct with this number *********2 Further detail information will be given when direct meeting.

Send a direct inquiry to this supplier

To:

Mr. Raziman < Global Capital Asset Management >

私は知りたい: