FOB Price
Get Latest Price5000 ~ 50000 / Piece ( Negotiable )
|Minimum Order
Place of Origin:
China
Price for Minimum Order:
Minimum Order Quantity:
1 Piece
Packaging Detail:
-
Delivery Time:
30days
Supplying Ability:
-
Payment Type:
T/T, L/C, Other
連絡先担当者 Nina
Qihang Building,Hanghai Road, Zhengzhou, Henan
Capacity:1ton**0ton/hr
Working pressure:1.*5Mpa 1.0Mpa 1.6Mpa
Structure: fire tube,3 pass,wet back boiler.
Fuel:light oil,heavy oil,natural gas,lpg,cng
All Factory prices include boiler auxiliaries:
1. Chimney 2.Valves & gauges
3. automatic oil or gas burner
4. pumps(2set)
5. steam header 6. water softener 7. electric cabinet