FOB Price
Get Latest Price1000 ~ 5000 / Set ( Negotiable )
|Minimum Order
Place of Origin:
China
Price for Minimum Order:
Minimum Order Quantity:
1 Set
Packaging Detail:
wooden package
Delivery Time:
1 month
Supplying Ability:
100 Set per Week
Payment Type:
L/C, T/T
連絡先担当者 Ms. Double
Room 503,No.23, 4703 Lane, Transportation Road, Putuo District., Shanghai, Shanghai
Model | Pressureon the
upperoller (Tons) |
Max. plate thickness |
Plate width (mm) |
Diameter of upper roller (mm) |
Diameter of lower roller (mm) |
Central distance (mm) |
motor (kw) |
|||
End bending (mm) |
central (mm) |
Driving | Hydraulic | Shift | ||||||
W*1SNC*8****0 | ***0 | 6 | 8 | ***0 | **0 | **0 | **0 | *5 | 7.5 | 4 |
W*1SNC**0****0 | **0 | 8 | *0 | ***0 | **0 | **0 | **0 | *8.5 | 7.5 | 4 |
W*1SNC**2****0 | **0 | *0 | *2 | ***0 | **0 | **0 | **0 | *2 | *1 | 5.5 |
W*1SNC**6****0 | **0 | *2 | *6 | ***0 | **0 | **0 | **0 | *0 | *1 | 7.5 |
W*1SNC**0****0 | **0 | *6 | *0 | ***0 | **0 | **0 | **0 | *7 | *5 | *1 |