FOB Price
Get Latest Price5000 ~ 20000 / Set ( Negotiable )
|Minimum Order
Place of Origin:
Shandong, China
Price for Minimum Order:
Minimum Order Quantity:
1 Set
Packaging Detail:
Standard export packing
Delivery Time:
25 days after deposit received
Supplying Ability:
100 Set per Month
Payment Type:
PayPal, Western Union, L/C, T/T
連絡先担当者 Cindy
ON.178 Jianxin Street, Shouguang Shandong Province,262700, Weifang, Shandong
Processing | Machines | Need Level |
1. Inspection | Inspeciton Machine | Must |
2. Buffing | Tyre Buffer | Must |
3. Dust Collecting | Dust Collector | Must |
4. Cementing | Mixing Machine | Must |
5. Filling | Extruding Machine or Extruding Gun | Must |
6. Tread Application | Building Machine/Tyre builder | Must |
7. Assemble Envelops | Envelops/Envelop spreader | Must |
8. Assemble the Steel Rings | Steel Rims Spreader/Remover | Must |
9. Tyre Carrying | Tyre Conveyor | Must |
*0. Curing | Curing Chamber/Vulvanizing Machine | Must |
*1. Accessory Machine | Air Compressor and air storage | Choose |