FOB Price
Get Latest Price21000 ~ 55000 / Set
|Minimum Order
Place of Origin:
Jinan Shandong China
Price for Minimum Order:
Minimum Order Quantity:
1 Set
Packaging Detail:
Construction hoist seaworthy container paking in nude(40HQ)
Delivery Time:
within 15 days after confirm the order
Supplying Ability:
1500 Set per Year
Payment Type:
D/P, L/C, T/T
連絡先担当者 Alex
Jinan Zhangqiu, Qingdao, Shandong
SC**0/**0 construction hoist
Our construction hoists are specially used for lifting passengers and materials under construction of high-rise buildings, tower, bridges, plant, chimney, and so on like that outdoor.
Protective Measures:
1. A Master switch On the operation board: When the button closed, unexpected action to other buttons can not let cabin working.
2. Anti-falling safety device (with Centrifugal breaking system ): When all other protection device losing action, it can brake the cabin from falling.
3. Mechanical inter-locking door: when the cabin running it can close by itself from protecting people from dropping.
4. Overload calling device.
5. upper and lower travel limit: They can limit the cabin go over the top mast.
6. The top mast section have no rack in order to limit the cabin overrunning and dropping.
7. Manual button: You can operate the botton to let the cabin go down wheninterruption of power supply.
8. Emergency switch: When the cabin losing control and over-runing, you can operate the button.
Main technical parameters:
1. Construction hoist of common models:
Characteristic |
Model |
Rated Loading |
Lifting Speed |
Motor Power |
Double cabin |
SC**0/**0 |
2×***0kg |
*3m/min |
2×(3×*1kw) |
SC**0/**0 |
2×***0kg |
*3m/min |
2×(2×*5kw) |
|
SC**0/**0 |
2×***0kg |
*3m/min |
2×(2×*1kw) |
|
Single cabin |
SC**0 |
***0kg |
*3m/min |
3×*1kw |
SC**0 |
***0kg |
*3m/min |
2×*5kw |
|
SC**0 |
***0kg |
*3m/min |
2×*1kw |
2. Construction hoist with Interver:
Characteristics |
Model |
Rated Loading |
Lifting Speed |
Motor Power |
|
Double Cabin
|
Low-speed |
SC**0/**0D |
2×***0kg |
***3m/min |
2×(3×*1kw) |
SC**0/**0D |
2×***0kg |
***3m/min |
2×(2×*1kw) |
||
Mid-speed |
SC**0/**0Z |
2×***0kg |
***5m/min |
2×(2×*1kw) |
|
SC**0/**0Z |
2×***0kg |
***5m/min |
2×(2×*1kw) |
||
Single Cabin |
Low-speed |
SC**0D |
***0kg |
***3m/min |
3×*1kw |
SC**0D |
***0kg |
***3m/min |
2×*1kw |
||
Mid-speed |
SC**0Z |
***0kg |
***5m/min |
2×*1kw |
|
SC**0Z |
***0kg |
***5m/min |
2×*1kw |
Adopting advanced technology, it can also be equiped with electrical overload warming device, auto landing-call equipment or autimatic leveling device according to your requirement.
A. D.O.L Common electrical type: This is the common one
B. PLC Electrical system type: The advantages like below:
1.Powerful anti-jamming performace.
2.Programmable design and electromagnetic wave shielding.
3.