あなたはまだ TradeKey.com のメンバーではないようです。 今すぐサインアップして、世界中で700万を超える輸入業者および輸出業者と接続します。
今すぐ加入、無料 |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
Sell dog food processing line

Sell dog food processing line

FOB Price

Get Latest Price

( Negotiable )

|

Minimum Order

Place of Origin:

China

Price for Minimum Order:

-

Minimum Order Quantity:

1 Piece

Packaging Detail:

wooden case

Delivery Time:

30 days

Supplying Ability:

1000 Piece per Month

Payment Type:

T/T

今すぐお問い合わせください
無料会員

連絡先担当者 Mr. Zhang

Wr6132, East Fushou, Weifang, Weifang, Shandong

今すぐお問い合わせください

Description

TECHNICAL PARAMETERS & RELEVANT SERVICES
1.Output: ******0 Kg/hr
2. Square for workshop: *8m2  and 5m high
3. Installed Capacity: *0kw
4. Voltage / Frequency (3 phase): **0V / *0Hz
5. Dimension (m): *4.0 x 2.0x 5
6. Workers Required: **3 Workers
7. Warranty: At least 1 year from the date of completion of the commissioning.
8. Installation/Operation/ Service/ Maintenance Manual:  Provided In English
PRE-SHIPMENT INSPECTION INCLUDES
 

  • Supplier should trial run whole line at supplier’s factory before shipment;
  • All raw materials for that trial run to be arranged by supplier at their cost.
EACH CLIENT CAN ENJOY THE FOLLOWING 7 SERVICES 
 
  1. Free consultation service before, during, and after sales;
  2. Free project planning and design services;
  3. Free debugging of equipment until everything is functional;
  4. Free management of equipments' long distance shipping;
  5. Free training of equipment maintenance and operating personally;
  6. Free new production techniques and formulas;
  7. Provide 1 year complete warrantee and lifetime maintenance service;        
INSTALLATION SUPERVISION AND COMMISSIONING Including salaries based on *0 hours per week as well as accident-and health insurance for:
 
  • Chief Installation Engineer for the duration of two weeks in total.   
  • Process Engineer for the duration of two weeks in total,
  • Electrical commissioning-Engineer for the duration of two weeks in total
The customer will be asked to provide room, board, round-trip transportation, and a nominal $*0 daily subsidy per person.
 
Period of installation:
The total length of the installation time depends on number and qualification of the available local stuff. A possible delay of the installation period will be additionally invoiced.
Remark: We will provide on-site service after 1 year. The customer will be asked to provide room, board, round-trip transportation, and a nominal $*0 daily subsidy per person.
 

Send a direct inquiry to this supplier

To:

Mr. Zhang < Sino APS Company Limited >

私は知りたい: