あなたはまだ TradeKey.com のメンバーではないようです。 今すぐサインアップして、世界中で700万を超える輸入業者および輸出業者と接続します。
今すぐ加入、無料 |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
Sell laser Tatto remove D003

Sell laser Tatto remove D003

FOB Price

Get Latest Price

1 ~ 10000 / Set ( Negotiable )

|

Minimum Order

Place of Origin:

beijing china

Price for Minimum Order:

Minimum Order Quantity:

1 Set

Packaging Detail:

Aluminum case

Delivery Time:

3-7 working days after payment

Supplying Ability:

-

Payment Type:

T/T, Western Union, PayPal, Other

今すぐお問い合わせください
無料会員

連絡先担当者 Ms. sun

Changchun Bridge Road,Haidian District, Beijing, Beijing

今すぐお問い合わせください

Description

Laser tatto remove D**3
Function

For endogenous pigment: nevus of Ota, coffee spot, age pigment, freckle etc removal.
For exogenous pigment: tattoo, eyeliner and eyebrow removal.
Technical parameters

 

Laser type Q-switched ND:YAG laser
Laser wavelength **2mn,***4mn
Frequency *-*0Hz
Energy level *****0mj
Size *2cm**0cm**0cm
Packing size *3cm**8cm**2cm
N.W *5kgs
Light source **0V/**0V *0Hz/*0Hz

Technology Advantages
1.Safety,non-invasive,no pain,no any adverse,no side effects.
2.Effective in treatment:skin whitening,skin rejuvenation,removal wrinkle,shrinking pore,effective once,keep a long time after treatment.
3.Simple operation,does not need training repeatedly.
4.High cost-effective,compare with reshaping and injection,no risk,worry-free and good effection, customers easy to accept.
 
OEM&ODM Service
1. To mark your logo on every one of your machine ordered from us for free.
2.To design and produce new frames as your requirements.
 
Warranty&After Service
1.To supply you 1 Year warranty of main frame,stainless water tank
2.To supply you life time maintenance,cause of modular design,you do not need to send back the total machine for repair,we could send you the new replacement parts and guide you how to change on your side.
3.Tosupply you on line training and training certificate.
 
Delivery
1.Todelivery your machine by express door to door,
like DHL,UPS,FEDEX,EMS,TNT,need only 3~7 working days arriving your place.
2.Todelivery by air,need only 5~7 working days arriving your airport.
 

Send a direct inquiry to this supplier

To:

Ms. sun < Jiatailonghe(Beijing) Technologies Co., >

私は知りたい: