Description
Application:
The tube ball mill is the key equipment in grinding after the
material is crushed. Ball mill is applied widely into
powder-making production line
including cement, silicate, new-type building material, refractory
material, fertilizer, ore dressing of ferrous metal and non-ferrous
metal, glass ceramics, etc.
The Operating Principle of tube ball mill
The tube ball mill is composed of horizontal cylinder, hollow
shafts, and grinding head. The cylinder is long and full of
grinding bodies. The cylinder is made from steel board and there
are steel liners fixed on the cylinder. The grinding bodies
generally are steel balls, and they are got into the cylinder
according to different types and diameters.
the material flows into the barrel through hollow shaft of feed
end. When ball mill rotates, the grinding bodies will be taken away
by the barrel’s liners inside the barrel because of the functions
of inertia, centrifugal force and friction. When the grinding
bodies rise into a certain height, it will fall because of its own
gravity. Those grinding bodies crush the material violently.
The material flows into hollow shaft through feeder, and then gets
rotationally and evenly into the first warehouse with stepped
liner, undular liner and steel balls. When the barrel rotates, its
centrifugal force rises into steel balls to a certain height and
then fall, and the steel balls thump and grind the material. After
grinded coarsely in the first warehouse, the material flows into
the second warehouse through monolayer partition. There are plane
liners and steel ball to further grind the material. Finally the
material power is discharged from stripper plate.
Installation and maintenance:
- machine’s maintenance
- Bearing. Crusher’s bearing bears the whole load of machinery,
so reasonable lubrication has a close relation to bearing’s
lifetime. The bearing has a direct influence on lifetime and rotary
rate, and thus the lubrication has to be clean and good
sealing.
- The new-stalled tyre is easy to be loose, so we have to have a
regular check.
- Check if the parts of machine are normal.
- Check the grinding degree of grinding parts and ready to change
them.
- If the bearing’s temperature is overheated, the present work
should be stopped and check.
- If there is a impacting sound in the process of operation,
stopping and checking.
The motor running
- The equipment is installed in the basis of horizontal concrete,
using bolt to fix.
- The main machine body should be vertical to level when
installation.
- After installation the workers have to check if bolts are loose
and the bin gate is fixed tightly.
- Allocate power line and control switch according to equipment’s
power.
- After check, the motor runs without load, If everything is ok,
production continues.