FOB Price
Get Latest Price100 ~ 500 / Unit ( Negotiable )
|Minimum Order
Place of Origin:
yucheng,china
Price for Minimum Order:
Minimum Order Quantity:
3 Unit
Packaging Detail:
iron frame
Delivery Time:
within 15days after payment
Supplying Ability:
500 Unit per Month
Payment Type:
T/T, L/C
Model | The **-blade harrow | The **-blade harrow | The **-blade harrow | The **-blade harrow | The **-blade harrow | The **-blade harrow | The **-blade harrow |
Type | 1BQX*1.1 | 1BQX*1.3 | 1BQX*1.5 | 1BQX*1.7 | 1BQX*1.9 | 1BQX*2.3 | 1BQX*3.4 |
Weight (kg) | **0 | **0 | **0 | **0 | **0 | **0 | ***8 |
Working width (m) | 1.1 | 1.3 | 1.5 | 1.7 | 1.9 | 2.3 | 3.4 |
Working depth (cm) | *4 | ||||||
Ground clearance(mm) | ≥**0 | ||||||
Working angle | *4ã€*7ã€*0ã€*3 | ||||||
Matched power (hp) | ****5 | ****8 | ****0 | ****5 | ****0 | ****0 | *****0 |