あなたはまだ TradeKey.com のメンバーではないようです。 今すぐサインアップして、世界中で700万を超える輸入業者および輸出業者と接続します。 今すぐ加入、無料 |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
waste to energy plant

waste to energy plant

FOB Price

Get Latest Price

|

Minimum Order

Place of Origin:

germany

Price for Minimum Order:

-

Minimum Order Quantity:

1 Unit

Packaging Detail:

containers

Delivery Time:

8-10 months after contract signing

Supplying Ability:

6 Unit per Year

Payment Type:

L/C

今すぐお問い合わせください
無料会員

連絡先担当者 Mr. lawrence

11 rue du stade, tagsdorf

今すぐお問い合わせください

Description

How does the MERA differentiate itself when compared with other similar plants?
 
 
Advantages of the MERA plant
 
A very high efficiency in the energy production leads to a faster return on investment
 
Low running and maintenance costs
 
Much lower investment necessary when compared to other similar plants with similar technology
 
The MERA functions *4/7.
The plant can also run without waste input, so an electricity production of 2.5 Megawatt per hour is the result with or without waste input
 
A minimal amount of external energy is necessary.
Either gas or diesel/domestic heating fuel can be used.
A typical consumption of diesel/domestic heating fuel per hour is *5 litres.
 
The small decentralized modules can be easily installed on the waste site or wherever the waste is produced, and can be transported on a low loader truck from one site to another.
 
As the physical size of the plant is relatively small, several MERAs can be installed on one site without any further problems.
The number of MERAs of course depends on how much waste per hour needs to be processed and/or Megawatts or electricity need to be produced.
 
Due to the efficiency of the pyrolysis  process absolutely  no slag is produced.
The end product is an inert ash which can be used in the construction and road construction industry.
This means that the furnace needs minimal maintenance and there are practically no production stoppages.
 
Extremely quiet (less than *0 dB (A))
 
The plant has practically no parts which could wear out.
The plant has been designed for a lifespan of up to *5 years
 
The average gas emissions are *0% lower than the values laid down in the EU regulations
 
The overproduction of heat and electricity, i.e. not used directly for the plant owner, will be fed into the grid (bought by the electricity company and the heat can be used for town central heating).
 
The actual construction/manufacturing time needed for a MERA is much shorter than comparable plants from other manufacturers
 

Send a direct inquiry to this supplier

To:

Mr. lawrence < tradeco2000 gmbh >

私は知りたい: