あなたはまだ TradeKey.com のメンバーではないようです。 今すぐサインアップして、世界中で700万を超える輸入業者および輸出業者と接続します。
今すぐ加入、無料 |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
Petroleum Manhole Assemblies

Petroleum Manhole Assemblies

FOB Price

Get Latest Price

0.1 ~ 10 / Acre

|

Minimum Order

Place of Origin:

-

Price for Minimum Order:

Minimum Order Quantity:

10

Packaging Detail:

-

Delivery Time:

-

Supplying Ability:

10000 Acre per Day

Payment Type:

T/T, L/C

今すぐお問い合わせください
無料会員

連絡先担当者 Mr. DAVID

888 Chengliu Mid .Rd .Madong industrial Zone ., Shanghai, Shanghai

今すぐお問い合わせください

Description

Specifications
RKG***-AS Aluminum Petroleum Manhole Assemblies are manhole covers, which are equipped on the top of tank truck. 


  RKG Series Of Aluminum Petroleum Manhole Assemblies

 

1)      Manhole Cover is equipped on the top of tank truck.

2)      It is the entrance of fluid transfer operation inspection and maintaining the inside tank. It can protect the tank when involving in an emergency.

3)      Under normal practice, vent is closed When loading and unloading and temperature variation, it will cause the pressure variation inside the tank, such as air pressure and negative vacuum pressure, the vent of manhole cover will be closed automatically in order to keep the tank under a normal pressure.

4)      When involving in emergency, such as a car accident, the Emergency Exhaust Valve will open the inside tank, meets the setting, in order to prevent explosion.

5)      It is internationally accepted, and specified, by oil companies  around the world to assist with the safe transportation of petroleum based products.    

 

6)    Features Benefits:

a.  Material: Extend aluminum plate

b.  Pressure and vacuum vent fitted as standard for tank breathing. Various ratings are available to suit operational requirements.

c.  Spring-loaded fill cap provides emergency fire engulfment venting to NTTC DOT **6, required in the event of the tank being exposed to a fire.

d.  Automatic sealing of the P/V vent in a roll over situation prevents dangerous and costly spillage.

e.  Aluminium cover arm is also available on some variants.

f.  Two-stage opening allows safe release of residual compartment pressure before fully opening the fill cap.

g.  **0mm(*0?)fill hole for easy drop pipe insertion when top loading.

h.  High quality of baseplate and component materials, to international standards, are used for durability and performance.

i.  Especially, theft-proof sensor of Aluminum  Alloy baseplate for Manhole Assemblies  is available.

 

7) Technique Specification:

a.  Setting pressure of vent discharge : 7.*4Kpa

b.  Negative opening pressure:*2Kpa~*3Kpa

c.  Setting pressure of emergency exhaust valve: 0.***6Mpa±0.**1Mpa

d.  Pressure resistance:0.**4Mpa

e.  Metting EN ****7:***2  Standard

Send a direct inquiry to this supplier

To:

Mr. DAVID < Shanghai AILE Petroleum MFG..Co Ltd >

私は知りたい: