FOB Price
Get Latest Price30 ~ 80 / Square Meter ( Negotiable )
|Minimum Order
Place of Origin:
-
Price for Minimum Order:
Minimum Order Quantity:
20 Ton
Packaging Detail:
Special export packing
Delivery Time:
30-60 days after construction drawing is confirmed
Supplying Ability:
2000 Ton per Month
Payment Type:
T/T, L/C, D/A, D/P, Western Union, Money Gram, PayPal
China
連絡先担当者 Ms. Mary
Huai West Road, Xuzhou, Jiangsu
Summary | Toledo, Philippine | |||||||
Dome Bolted ball joint Space Frame | ||||||||
Dome Barrel coal storage | ||||||||
Length:**0m, Wide:*8m, Height:*2.*7m | ||||||||
**2MT | ||||||||
****0MT | ||||||||
Design code: | Wind load: | Earthquake load: | Live load: | Dust load: | Temperature: | Snow load: | Components | Steel #*5, epoxy zinc primer with PU paint |
Steel Q**5, epoxy zinc primer with PU paint | ||||||||
*0Cr, electro-galvanization | ||||||||
Steel Q**5 & #*5, electro-galvanization | ||||||||
Steel Q**5, galvanization | ||||||||
Sandwich panels |
Summary | Toledo, Philippine | |||||||
Bolted ball joint Space Frame | ||||||||
Arch coal storage | ||||||||
Length:**0m, Wide:*8m, Height:*2.*7m | ||||||||
**2MT | ||||||||
****0MT | ||||||||
Design code: | Wind load: | Earthquake load: | Live load: | Dust load: | Temperature: | Snow load: | Components | Steel #*5, epoxy zinc primer with PU paint |
Steel Q**5, epoxy zinc primer with PU paint | ||||||||
*0Cr, electro-galvanization | ||||||||
Steel Q**5 & #*5, electro-galvanization | ||||||||
Steel Q**5, galvanization | ||||||||
Sandwich panels |