あなたはまだ TradeKey.com のメンバーではないようです。 今すぐサインアップして、世界中で700万を超える輸入業者および輸出業者と接続します。 今すぐ加入、無料 |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
SGS Waste Water Treatment Line

SGS Waste Water Treatment Line

FOB Price

Get Latest Price

( Negotiable )

|

Minimum Order

Place of Origin:

-

Price for Minimum Order:

-

Minimum Order Quantity:

1

Packaging Detail:

-

Delivery Time:

-

Supplying Ability:

-

Payment Type:

T/T, L/C, D/P, Western Union

今すぐお問い合わせください
無料会員

連絡先担当者 Mr. Chen

No.12 Huanghe Road, Changshu, Jiangsu

今すぐお問い合わせください

Description

1.Project Overview
1.1 Project overview
The factory is located in xxx,wastewater mainly comes from the following zones: xxx and xxx
Main adoptive wastewater treatment technology:
(1) Air Floatation 
(2) Membrane Bioreactor (MBR)
(3) Reverse Osmosis (RO)
This System insures treated water standard, automatic PLC control, easy operation and maintenance.
 
1.2 Wastewater 
1.2.1 Wastewater source:
(1) Degreasing wastewater is *5 m3 per month;
·degreasing tank; the main chemical component is sodium hydroxide, pH=9.***1.0,volume is **0 liters,solution change is 4 times per month .solution temperature is *0 ºC.
·tap water rinsing tank *2pcs; volume is **0 liters each, solution change is 4 times per month, tank rinsing is 4 times per month, volume of rinsing water is ***0 liters per month.
(2) Iron series phosphating wastewater is *7 m3 per month .
·iron phosphating tank; the main chemical component is orthophosphoric acid( the agent is Granodine ***0,the manufacturer is "Henkel"), pH is 4.**5.6, volume is ***0 liters, solution change is once per month ,tank rinsing is once per month ,volume of rinsing water is ***0 liters, solution temperature is ****5ºC.
·tap water rinsing tank*1pc; volume is ***0 liters, water change is 4 times per month, tank rinsing is once per month, volume of rinsing water is ***0 liters.

2.Project Design

  1. Design basis
        2.1.1 Design water standard

2.2 Design principle

(1)Environmental Protection Act(Russian)(January *0, ***2);
(2)Nature Conservation Act of Russian SFSR;
(3)Administrative Laws and Regulations of Barnaul NO.***7( August *0, ***0);
(4)other documents delivered by customer.


3. Process Flow
3.1 Process flow
Based on the technological process in the 2 production zones and chemical analysis of wastewater, wastewater treatment process (WWTP) of Air Floatation combined with Membrane Bioreactor (MBR) and Reverse Osmosis (RO) is selected. 