FOB Price
Get Latest Price( Negotiable )
|Minimum Order
Place of Origin:
Chengdu, Sichuan, China
Price for Minimum Order:
-
Minimum Order Quantity:
1 Piece
Packaging Detail:
65Kg
Delivery Time:
12 Days
Supplying Ability:
300 Piece per Week
Payment Type:
T/T, L/C, Western Union, Money Gram, Other
China
連絡先担当者 Mr. John
No.386 Baoguang Road South,Xindu District,Chengdu,Sichuan province,China, Chengdu, Sichuan
Model | RJZC*2 |
Electric power (KVA) | 3.6 |
Voltage(V) | **0 |
Frequency(HZ) | *0 |
electric current(A) | *6 |
Max Bearing Weight(Kg) | *5 |
Inside Diameter(mm) | *****0 |
Max Outside Diameter(mm) | **0 |
Max Width(mm) | **0 |
Rotary Arm | YES |
Tallest Temperature | **0 °C |
Heating rod size                   Cross-sectional side length (mm) | *0,*0,*0,*0,*0 |
Weight (KG)Â | *5 |