FOB Price
Get Latest Price( Negotiable )
|Minimum Order
Place of Origin:
-
Price for Minimum Order:
-
Minimum Order Quantity:
500 Piece
Packaging Detail:
packed in nylon firstly, then carton, and then reinforced with wooden case for outer packing
Delivery Time:
15 working days after payment
Supplying Ability:
5000 Piece per Day
Payment Type:
T/T, Western Union
連絡先担当者 zhao
Shenzhen, Guangdong
Specifications
Technical Parameter |
diameter |
10mm |
voltage |
1.5V |
|
current |
32mA or customized |
|
motor |
DC brush motor |
|
torque |
85gf.cm or customized |
|
speed |
40 rpm | |
reduction ratio |
171 or customized |
|
noise level |
less than 40dB |
|
life time |
500 hours |
|
working temperature |
-40 to 95℃ |
|
tolerance |
< 0.3mm |
|
Certification |
ROHS/ISO9001/ISO14001/SGS/TS16949 |
|
Suitable for |
Eyebrow pencil, Camera, Health care product, Auto watering device, and etc. |
|
OSD Language |
English, French, German, Italian, Russian, Spanish, Portuguese, Dutch, Greek, Japan, Korean |
|
The basic specifications for reference only, specifications can be customized. |
Main Products
1) Precise component and assembly of plastic and metal powder injection;
2) Precise motor gear box reducer: diameter 4-40mm,
Output speed: 5-2000rpm,
Reduction ratio: 2-2000,
Output torque: 1.0gf-cm to 50Kgf-cm;
3) Customized worm and gear transmission machinery;
4) Precise electromechanical motion module.
Description
Model | At Rated Load | At Stall | Transmission Reduction | Overall Length L | Gear Box Length L1 | |||
Speed | Current | Torque | Stall Torque | Stall Current | ||||
rpm | mA(MAX) | gf.cm | gf.cm | mA | Ratio | mm | mm | |
ZWPD010010-171 | 40 | 70 | 85.0 | 165.0 | 160 | 171/1 | 18.3 | 7 |
Applications
Eyebrow pencil, Camera, Health care product, Auto watering device
Competitive Advantage
Reliability Test
1. Life Test : being continuously working for required period of time, then stop, then repeat
2. Noise Test : being put at the distance of 1m (or other requirements) to the test equipments to test the noise
3. Water-proof Test : being put 10mm under the water working for 2 weeks and 100m under the water working for 12 hours
4. Salt Spray Test: salt spray can test the products resistance to corrosion
5. Impact Test: two objects striking each other at high relative speeds
6. Storage Test: being stored under normal temperature for 1 or 2 years to test stability
7. Environmental Related Substance
2D Drawing
Payment terms
1) Advance Payment: 50% of tooling.
2) After sending the first sample for testing: 30% payment of tooling
3) Qualified the samples: 20% payment of tooling and samples fee.
Once we got the 50% tooling payment, we will launch the project and begin production.
The lead time need 45 days.