Description
What is the benefit for 3D panel building system?
1.low cost
2.Simple installation,shortening of construction time
3.Thermal and sound insulation
4.Durable or low-maintenance
5.Environment friendly
6.Recycled green products
7.Fire & Moisture proofing
8.Hurricane & Earthquake protection
EPS 3D panel Installation
1.Install 3D wall panel
â‘ Rebar installation
Install rebar on foundation beams, floor slabs, columns and beams,
where the panels are to be installed. The rebar are installed in an
alternating (zigzag) pattern. For steel structures, the rebar are
welded onto the steel beams and columns.
â‘¡Attach the 3D panel together
Prepare panels according to plan drawings, or trim panels if they
arrive in modular typical sizes, according to the needs. Tie the
panel onto the rebar using tie wire.
â‘¢ Window & Door
The opening of window and door should be cut well before install
the wall panel.Install cross braces on each corners of door and
window openings, on both side of the panels. Mount U-mesh around
the perimeter of door and window openings.
â‘£ Corner mesh
Install U type mesh or Angle mesh at each corner at full length of
the corner on both inner and outerside. The angle mesh service as
additional bracing to allow corner to function as columns after
concrete is applied.
⑤ Support braces and alignment
Install supports, and perform alignment for the panels, so
they are installed straight and each plane is perpendicular to each
other.
â‘¥First plastering and guide installation
Apply first layer of concrete on both side of the panels, using
shotcrete machine. Afterwards, install guidance to ensure
consistent thickness of the second (final) layer of plaster.
⑦Second plaster
Apply the second layer of plaster, then smoothen the surface using
screed.
⑧Skim coat/Finishing
Wall is ready for finishing by skim coat or paint.
2.Install 3D panel slab, floor panel, roof
â‘ Installation of scaffolding and formwork
Install scaffolding and prepare formwork. If desired, fenolite
sheeting can be applied at this stage.
â‘¡Panel and beam reinforcement installation
Place panels on top of formwork, tie them to installed rebar,
insert steel reinforcement into the trenches on floor panels.
â‘¢ Concrete pouring/casting
Cast the void between formwork and the panels with concrete mix
without aggregate, followed by concrete mix with aggregate for
topping up and filling of the reinforcement trenches.
â‘£Finishing
Screed surface until perfectly level. Afterwards, surface can be
used to mount tiles, carpet, etc.