あなたはまだ TradeKey.com のメンバーではないようです。 今すぐサインアップして、世界中で700万を超える輸入業者および輸出業者と接続します。 今すぐ加入、無料 |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
3D panel house

3D panel house

FOB Price

Get Latest Price

( Negotiable )

|

Minimum Order

Place of Origin:

-

Price for Minimum Order:

-

Minimum Order Quantity:

1 Set

Packaging Detail:

-

Delivery Time:

-

Supplying Ability:

-

Payment Type:

L/C, T/T

今すぐお問い合わせください
無料会員

連絡先担当者 Ms. Vivian

No. 228 North of Jianshe Street, Shijiazhuang, Hebei

今すぐお問い合わせください

Description

What is the benefit for 3D panel building system?



1.low cost

2.Simple installation,shortening of construction time

3.Thermal and sound insulation

4.Durable or low-maintenance

5.Environment friendly

6.Recycled green products

7.Fire & Moisture proofing

8.Hurricane & Earthquake protection



EPS 3D panel Installation



1.Install 3D wall panel



â‘ Rebar installation

Install rebar on foundation beams, floor slabs, columns and beams, where the panels are to be installed. The rebar are installed in an alternating (zigzag) pattern. For steel structures, the rebar are welded onto the steel beams and columns.

â‘¡Attach the 3D panel together

Prepare panels according to plan drawings, or trim panels if they arrive in modular typical sizes, according to the needs. Tie the panel onto the rebar using tie wire.

â‘¢ Window & Door

The opening of window and door should be cut well before install the wall panel.Install cross braces on each corners of door and window openings, on both side of the panels. Mount U-mesh around the perimeter of door and window openings.

â‘£ Corner mesh 

Install U type mesh or Angle mesh at each corner at full length of the corner on both inner and outerside. The angle mesh service as additional bracing to allow corner to function as columns after concrete is applied.

⑤ Support braces and alignment

 Install supports, and perform alignment for the panels, so they are installed straight and each plane is perpendicular to each other.

â‘¥First plastering and guide installation

Apply first layer of concrete on both side of the panels, using shotcrete machine. Afterwards, install guidance to ensure consistent thickness of the second (final) layer of plaster.

⑦Second plaster 

Apply the second layer of plaster, then smoothen the surface using screed.

⑧Skim coat/Finishing

Wall is ready for finishing by skim coat or paint.



2.Install 3D panel slab, floor panel, roof



â‘ Installation of scaffolding and formwork

Install scaffolding and prepare formwork. If desired, fenolite sheeting can be applied at this stage.

â‘¡Panel and beam reinforcement installation

Place panels on top of formwork, tie them to installed rebar, insert steel reinforcement into the trenches on floor panels.

â‘¢ Concrete pouring/casting

Cast the void between formwork and the panels with concrete mix without aggregate, followed by concrete mix with aggregate for topping up and filling of the reinforcement trenches.

â‘£Finishing

Screed surface until perfectly level. Afterwards, surface can be used to mount tiles, carpet, etc.

Send a direct inquiry to this supplier

To:

Ms. Vivian < Shijiazhuang Haosen Business Service Co. >

私は知りたい: