FOB Price
Get Latest Price|
Minimum Order
Place of Origin:
-
Price for Minimum Order:
-
Minimum Order Quantity:
1 Twenty-Foot Container
Packaging Detail:
0 / box, 360ML / support Double plastic tube carton packaging A, B component with plastic ratio: 5
Delivery Time:
3 days after confirmation of order
Supplying Ability:
100 Forty-Foot Container per Month
Payment Type:
T/T, L/C, Western Union
South Africa
連絡先担当者 Mr. AS
117 HEIDELBURG ROAD, DEEP CROWN MINES, JOHANNESBURG GAUTENG
This product is an important component of epoxy resin
Solidification speed, anchoring strength as embedded
No expansion stress, good seismic performance
With quick and easy without the use of glue, easy construction
Good anti-aging, anti-corrosion, heat resistance
Scope: concrete structural beams, plates, columns, walls reinforced anchorage section of the original structure increases
Footings fixed structure plus layer beams, plates, columns anchorage, machinery and equipment
Embedded steel plate fixation, building brick wall anchor tie bar
Railways, roads, bridges expansion project reinforcement
Usage:
1, drilling: Drilling using a hammer or drill, drill size and drilling depth should be strictly in accordance with the design drawings.
2, Chiang Khong: implantation reinforced hole should be preceded with a hair brush, hair dryer and then dust the hole Chuijin, repeated three times to brush hole blow hole
3, plastic injection: the supporting static mixer installed in the front pack of gum, with a small amount of glue gun to not completely rule out the inner part of the mixer mixed colloid, and then inserted into the bottom of the hole static mixers slow uniform outward movement from the inside plastic injection, with a rubber speed to ensure that no gas holes or gaps, plastic injection volume to reach two-thirds of the deep hole.
4 anchorage: a rotatable manner in a continuous reinforcing bar or screw hole of the implant, until the bottom of the hole with adhesive overflows.
5 Curing: After steel or screw implanted in the initial setting time can not touch the rod, can be completely cured after the next process of construction and do testing.
|
|