FOB Price
Get Latest Price700 ~ 800 / Ton ( Negotiable )
|Minimum Order
Place of Origin:
-
Price for Minimum Order:
Minimum Order Quantity:
1 Set
Packaging Detail:
BULK PACKING THEN PALLET PACKED
Delivery Time:
30DAYS AFTER PAYMENT
Supplying Ability:
200 Ton per Month
Payment Type:
T/T, L/C, D/A, D/P, Western Union, PayPal
連絡先担当者 Ms. zhu
wuyun road, Wuxi, Jiangsu
steel plank can replace timber or bamboo plank, construction workers can walk on that.There
are many different sizes and materials of the steel plank, we can make that products according
to the customer's requirements
1) A larger capacity
When the scaffolding geometry and structure is compliant with the relevant requirements, the general single-tube column scaffold bears capacity of up to 15kN ~ 35kN (1.5tf ~ 3.5tf, design value).
2) Easy disassembly, erection and flexible
Easy to adjust the length of the tube, fastener connection is simple, and thus can adapt to all kinds of plane, elevation of buildings and structures with the scaffold.
3) To compare the economy
Processing is simple, a relatively low investment costs; if well-designed scaffolding geometry, focus on improving working capital utilization rate of steel, the material consumption can be achieved better economic results. Fastening steel frame construction steel per square meter equivalent to about 15 kg.
PRODUCT TYPES