あなたはまだ TradeKey.com のメンバーではないようです。 今すぐサインアップして、世界中で700万を超える輸入業者および輸出業者と接続します。 今すぐ加入、無料 |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
Set screw low  X054D162G54 supplier

Set screw low X054D162G54 supplier

FOB Price

Get Latest Price

10 ~ 80 / Piece

|

Minimum Order

Place of Origin:

-

Price for Minimum Order:

Minimum Order Quantity:

1 Piece

Packaging Detail:

Inner packing with recycle plastic box and anticorrosive oil, outer with sponge and PE bag

Delivery Time:

7-10day

Supplying Ability:

1000 Piece per Week

Payment Type:

T/T, Western Union

今すぐお問い合わせください
無料会員

連絡先担当者 edm

Dongguan, Guangdong

今すぐお問い合わせください

Description

Additional Information
Name Coding Specification Compatible Kenos model
Set screw low X054D162G54 OD 10.5 mm x ID 0.4 mm x 11 mm L
Diameter: 0.40 mm
 
Mitsubishi DWCXXX-F STD, Mitsubishi DWCXXX-F1 STD, Mitsubishi DWCXXX-G STD M108

 

About KENOS

KENOS responsibility is to ensure that dealers have sufficient profit space, protect the interests of dealers and agents.Dongguan KENOS Hardware Technology Co., Ltd. is an enterprise specializing in manufacturing and wholesaling WEDM-LS commonly used products, including consumables and spare parts such as WEDM-LS filter,Set screw low X054D162G54, ion exchange resin, diamond Wire Guides, conductive block, insulating plate, water nozzle.

 

A day can be divided into before work, work, work in the maintenance:
1 before work:(1) check the buttons and switches, buttons, etc., the requirements of flexible and reliable, accurate location;(2) check the safety device, fastening device, the requirements of accurate, flexible, reliable, no loose;(3) check all kinds of instruments, the requirements of the correct, sensitive;(4) check the oil level, oil or grease lubrication chart according to the road, the amount of oil to meet the requirements;(5) the execution engine operation, each part should fully exercise and lubrication.
2 work:;(1) the implementation of operational procedures, to strictly abide by(2) at any time to listen, look, touch, smell, observe the operation of equipment, to timely treatment, without trouble running.
3 after work:(1) cleaning chip, wipe the appearance, the taper hole of the main shaft and the sliding surface, more than three days not to anoint rust, to strictly abide by.(2) each moving parts, buttons and switches in a reasonable position to strictly comply with;(3) cut off the power supply and air source, must be strictly observed;(4) clean up the environment around the machine tool, without obstacles.
Weekend
Weekend maintenance:Wipe all parts (including the operation of the panel, buttons, etc.), check the cleaning and filtering device, according to the slip table, while adding coolant to check whether the loosening of fasteners. Cleaning of spindle hole. Must be strictly abide by these.
Regular maintenance of the spark machine is equivalent to maintenan the wire edm wear parts, so that it can delay the use of the wire edm wear parts, so it is very important to understand the know ledge of the Wire EDM Wear Parts,.What\'s more ,if you want to know more of the Mitsubishi wire EDM parts knowledge could login KENOS official website .

 

kenosedm10

 

 

 

Send a direct inquiry to this supplier

To:

edm < Dongguan KENOS Hardware Technology Co., Ltd. >

私は知りたい: