FOB Price
Get Latest Price2.68 ~ 3 / Piece ( Negotiable )
|Minimum Order
Place of Origin:
china
Price for Minimum Order:
Minimum Order Quantity:
10 Piece
Packaging Detail:
wooden pallet
Delivery Time:
within 15 days
Supplying Ability:
100000 Piece per Month
Payment Type:
T/T, L/C, Western Union, Money Gram, PayPal
連絡先担当者 Mr. JKack
huifeng road, da wan town, gaoyao, Zhaoqing, Guangdong
Sunstone roof tiles offer your following :
Â
Â
PRODUCTIONOur production facility is one of the most sophisticated in the world. The teamwork between our technical and production groups has resulted in many automated systems. These systems are not just responsible for production speed, they also ensure the consistent quality of our finished goods.
Producing a coated metal tile involves four basic steps.
1. metal forming
2. coating
3. curing
4. warehousing
Large coils of Zinc-Aluminium steel are shipped into the factory. The coils are cut and formed into roof tiles and accessories.
The newly formed pieces are sent from the metal department to the coating department. Here they are coated with either high-grade roof paint, or coated in basecoat and covered in stone chips.
The newly coated pieces are then transferred to large ovens where they are baked until the coatings are fully cured and stable.
All the cured parts and pieces are then palletized, wrapped, labeled and prepared for shipping.
We employ full time professionals whose sole responsibility is testing and auditing our production process and materials. Adherence to strict guidelines maintains our foremost level of quality.