あなたはまだ TradeKey.com のメンバーではないようです。 今すぐサインアップして、世界中で700万を超える輸入業者および輸出業者と接続します。
今すぐ加入、無料 |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
The latest rotary refining equipmen

The latest rotary refining equipmen

FOB Price

Get Latest Price

30000 ~ 60000 / Set ( Negotiable )

|

Minimum Order

Place of Origin:

-

Price for Minimum Order:

Minimum Order Quantity:

1 Set

Packaging Detail:

-

Delivery Time:

15 to 20 days

Supplying Ability:

1000 Set per Month

Payment Type:

T/T, PayPal

今すぐお問い合わせください
無料会員

連絡先担当者 Mr. wenjie

Xuchang huadu, Zhengzhou, Henan

今すぐお問い合わせください

Description

The latest fully automatic feed waste rubber waste tyre refining equipment

Raw materials for refining equipment:
Waste tires (including all kinds of mechanical tyres, tyre, etc); Waste rubber, sole, inner tube, ordinary cable skin, bicycle and motorcycle tyre; Plastic: PE (price is high, generally used to make plastic particles), PET (transparent bottles, try not to use) (pipe), PP, PVC, disposable cups, try not to use), and waste products such as all kinds of nylon.
The type and purpose of the end product:
End products manufactured by waste tyre materials: *5% tire oil; *5% carbon black; ****5% steel wire; **8%. Tyre oil is also called fuel oil, can be directly sold (they are also used for processing or used as boiler fuel, bath center, restaurants, burn floor tile, etc.) or deep processing with refining equipment. The black carbon can be sold directly, the market price is **0 yuan - ***0 yuan per ton, *0 to **0 per ton. Can use carbon black refining equipment processing, there are two kinds of model machine, one is *******0 mesh, equipment prices probably tens, end products can do tire rubber or filling material, one kind is ********0 mesh, equipment prices probably daily, end products can do industrial carbon black, printing ink, can also do the international standard of N**0 N**0 rating standard. Plastic oil can also be called fuel oil, sold directly or as a fuel. The carbon black of plastic is a slight quality nearly, the price is usually ***0 yuan/ton. Other old raw materials are similar.
Power and fuel:
The machine is powered by electricity.
Fuel is coal (an average of *0 to *0 kilograms per ton of raw materials), wood, heavy oil (heavy oil spray gun), electricity, oil and gas, liquid gas.
4, machine type and size:
Unit size (mm) volume (m cubed) amount of power equipment (tons) per furnace (ton).
1 jj*2,**0 * ***0 * *4, ***0 * ***0 *3 5 pilot fan 4KW
Blower 1 KW oil pump 1.5 KW
The pump 1.5 KW
The slag machine (3KW) *5
2 jj*2, 2, 2, 2, 6, 2, 2, 2, 2, 2, 2, 2, 2, 2, 6, 6, 6, 6, 6, 6
3 jj****0 * ***0 ***0 * ***0 *7 pilot fan 5KW
Blower 1 KW oil pump 1.5 KW
The pump 1.5 KW
The slag machine (3KW) *8
4 jj****0 * 6,**0 2,**0 * ***0 *0 8 *9
5 jj****0 * ***0 ***0 * ***0 *2 8 draft fan 7.5 KW engine speed reducer 5.5 KW
Blower 1 KW oil pump 1.5 KW
The pump 1.5 KW
Slag machine 3 kw *0
6 jj****0 * 6,**0 ***0 * 6,**0 *5 9 *2
7 jj*2,**0 * ***0 2,**0 * ***0 *7 *0 *5
8 jj*2,**0 * 6,**0 2,**0 * ***0 *1 *2 *8
5, plate thickness selection:
Normally we take the national standard Q**5R boiler plate. *4mm (*4.*5) and *6mm (*6.*5) thickness plates as host materials.
Equipment area:
Equipment covers an area of **0 square meters, *0 meters long and *5 meters wide), plus a pre-existing materials and end products piled up, workers rest, accommodation area, simple fire zone area, green area, office area, the minimum to more than ***0 square meters.
Installation of equipment:
The main ground (the concrete is needed because the main engine is required and the raw material is about *0 tons). Cooling water circulation pool; Storage pool temporarily; The general construction cost is about *0,**0 yuan.
8, the amount of time required for various types of device operation: [equipment cracking time: different materials, different models of machines are different.
Serial number type loading time
(hour) cracking time
(hour) cooling time
Automatic discharge time
(h)
1 jj*2,**0 * ***0 2, **8 hours **3, **2
2 JJ - ***0 * ***0
3 jj****0 * ***0 **3, **9 hours
4 JJ - ***0 * ***0
5 jj****0 * ***0 **3 ****2 hours **5, **3
6 JJ - ***0 * ***0
7 jj*2,**0 * ******4 hours
8 JJ - ***0 * ***0
The oil rate of various raw materials:
Remark on the classification of raw materials

****5% of the waste tyre\'s **0 type of steel wire is generally referred to as a small car
The ***-type wire tyre is *5% to *8%, generally referred to as a truck
The ********0 model *8% - *0% large mechanical engineering vehicle
Wool tires *0% - *0%
All kinds of waste rubber and triangle strip are *0% to *5%
The sole of the sole is *5% to *0% of the sole
The inner tyre of the inner tube is *5%
Regular cable skin is *5% to *0% of the type of polychloride
Bicycle tyres are *0% to *5% tyres

Waste plastic PE is *0% high
PET transparent beverage bottle
*0% of PVC is used for waste water pipes
PP refers to a disposable water cup
Comparison of oil and diesel standard:
Serial number category color density (g/m after) combustion value (calories) ℃ flash point
1 plastic oil pale yellow 0.***0.***0 *0
2 tyre oil is dark red, 0.***0.*1 ****0
The national standard diesel oil is less than or less than 0.*4, ***0 is greater than *5
*1, operational workers:
1, each machine has 2 workers, 4 workers in a row (for intermittent machines).
2, if it is automatic feed (if it is already processed) 2 workers will be ok.
Purchase equipment delivery period:
Delivery will be *5 days from the date of receipt of the deposit.
Problem of equipment installation:
Installation time: within *0 days at home (installation, commissioning and training); Foreign country *5 days - *0 days.
Fourteen, transportation:
Domestic transportation requires a large, *7.*-meter, high-pitched truck.
*5, compared with other manufacturers, our advantages:
We guarantee the quality of the product for two years because of the quality of the product.
The main engine adopts the steel plate, which can be provided to the customer.
3) outside the host accessories: such as air bags, we use 8 mm plate, highest air temperature can reach ******0 ℃, if the board too thin, short service life. The thickness of the tank is 5mm, the base channel steel usually USES *6mm and *8mm, the base of the base also needs to bear the weight of a dozen tons, so if the channel thickness too thin is not ok.
4) the host thickness is *4mm or *6mm, by customer\'s choice; The national standard plank is not good, the actual thickness is *4.*5 mm and *6.*5 mm.
The company\'s commitment to product quality:
The whole machine is guaranteed for two years.
More than four years of service life (**5 years); After 4 years test plate thickness, try to replace.

​
 
 

Send a direct inquiry to this supplier

To:

Mr. wenjie < Huadu machinery equipment co., LTD >

私は知りたい: