FOB Price
Get Latest Price50000 ~ 80000 / Set
|Minimum Order
Place of Origin:
-
Price for Minimum Order:
Minimum Order Quantity:
1 Set
Packaging Detail:
container
Delivery Time:
3 months
Supplying Ability:
110 Set per Year
Payment Type:
T/T, L/C
連絡先担当者 Mr. Max
BAOAN TUN, SHAWA, Cangzhou, Hebei
1.The machine can work steadily with the whole holder, and the protect cover adopts high grade seamless steel tube, so the structure is also steady with lower noises.
2.The timing power can be manipulated easily to adjust the speed .The protect cover has the right and reverse direction circumrotate.
3. The main machine and the haul-off unit adopt shift gears case, so the working intensity is lower and the pitch is exact.
4. Equipped with automatic parking equipment -the safeguard, it means the machine will stop when the thread runs out or the door is open.
|