あなたはまだ TradeKey.com のメンバーではないようです。 今すぐサインアップして、世界中で700万を超える輸入業者および輸出業者と接続します。
今すぐ加入、無料 |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
Pressure flow mixed flow fan

Pressure flow mixed flow fan

FOB Price

Get Latest Price

100 ~ 1000 / Piece ( Negotiable )

|

Minimum Order

Place of Origin:

-

Price for Minimum Order:

Minimum Order Quantity:

1 Unit

Packaging Detail:

carton

Delivery Time:

10-20days

Supplying Ability:

1000 Unit per Month

Payment Type:

Western Union, L/C, T/T

今すぐお問い合わせください
無料会員

連絡先担当者 Selina

Dezhou, Hubei

今すぐお問い合わせください

Description

CHARACTER

Mixed-flow fan is a new type of fan between centrifugal and axial flow. It has higher pressure and larger air volume than the same number of centrifugal fan. It has the characteristics of high efficiency, wide efficiency area, low noise, compact structure and convenient lamp installation. It is widely used in the air supply and exhaust system of industrial and mining enterprises and high-rise buildings.



TECHNICAL
 

Flow: Mixed-flow fan
Total pressure:  oem
Rotating speed:  oem
Medium temperature:  oem
Ambient temperature:  oem
Intake pressure:  oem
The scope of the product: ****0 Square meter
Moq:  *0



FAQ

Q1: How to order your product ? 

A1:Please tell us the model and quantity and other requests you need.



Q2: Could I buy a sample before placing the order. 

A2:Yes,It is ok. Welcome to your samples orders.



Q3: What is your payment terms?

A3: Payment terms vary among different countries. Generally, *0% T/T in advance, *0% balance before shipment.

 

Q4: Can I use my own LOGO design on goods?

A4: Yes, customized logo and design on mass products are available.(It can't constitute infringement)

 

Q5: Can I customized the products?

A5: Yes, customization is available.

 

Q6:  What is the lead time after placing the order?

A6:  Normally, it takes about **2 weeks after your order. However, it would depend on our production line schedule and the complexity of the item.

Engineering is about **3 Months after receiving your confirmation.



Q7:  Do you test all your goods before delivery?

A7:  Yes, we have **0% test before delivery.

Send a direct inquiry to this supplier

To:

Selina < Dezhou Winifred IMPORT >

私は知りたい: