FOB Price
Get Latest Price( Negotiable )
|Minimum Order
Place of Origin:
-
Price for Minimum Order:
-
Minimum Order Quantity:
1 Set
Packaging Detail:
wooden package
Delivery Time:
15 to 20 days
Supplying Ability:
100 Set per Month
Payment Type:
Western Union, L/C, T/T
連絡先担当者 Ms. Jinzhen
East Jinshui Road, Shanghai, Shanghai
.1. The overall layout is
compact, covers a small area. Only single storey layout is needed
for the boiler room, low cost on infrastructure construction,
convenient for transportation, and short installation period.
2. Using spirally corrugated tubes, strengthen the disturbance of flue gas, high heat transfer efficiency. 3. Reasonable design, safe and reliable operation, flat fire bed, and high thermal efficiency. 4. Complete auxiliaries, mechanized coaling and slag tapping, convenient operation. 5. Use chain grate, low coal leakage, good ventilation, wide adaptability of different coals. 6. The boiler shell use aluminium silicate board for heat preservation, low heat loss. 7. Equipped PLC full automatic intelligent control system, operate automatically. 8. Full automatic interlock protection program, has the protection function of water shortage, over pressure, over temperature, gas leakage, flame out, and electric leakage, etc. 9. By equipping with economizer, make full use of flue gas heat, increase the thermal efficiency |
Model Item |
DZL1 | DZL2 | DZL4 | DZL6 | DZL8 |
DZL10 (Assembly) |
DZL15 (Assembly) |
DZL20 (Assembly) |
|
Steam
Capacity (t/h) |
1 | 2 | 4 | 6 | 8 | 10 | 15 | 20 | |
Steam
Pressure (MPa) |
0.7/1.0/1.25 | 1.25/1.6 | |||||||
Steam
Temperature (℃) |
170/184/194 | 194/204 | |||||||
Feed water Temperature(℃) | 20 | 20 | 20 | 20 | 20 | 70 | 70 | 70 | |
Heating Area(m2) | Body | ~33 | ~50 | ~100 | ~170 | ~200 | ~250 | 316 | 502 |
Econom izer |
10.56/20.7 | 27.6 | 52.48/33.12 | 87.2 | 98 | 174 | 351 | 382 | |
Effective
Grate Area(m2) |
2.22 | 2.22 | 4.1 | 5.5 | 7.95 | 9.75 | 11.1 | 23.9 |