FOB Price
Get Latest Price600 ~ 50000 / Set ( Negotiable )
|Minimum Order
Place of Origin:
-
Price for Minimum Order:
Minimum Order Quantity:
1 Set
Packaging Detail:
Packed with plastic film.
Delivery Time:
30-60 days after received 30% deposit payment
Supplying Ability:
190 Set per Year
Payment Type:
T/T, L/C, Western Union
連絡先担当者 Mr. Steven
Shifang Road, Shijiazhuang, Hebei
Model | GT**5 | GT**6 | GT**8 | GT***2 | GT***4 |
Wire diameter (mm) | **5 | **6 | **8 |
***2 (round rod), ***0 (ribbed bar) |
***4 |
Cut length (m) | 0.**3 | 0.**6 | 0.**6 | ***2 | 0.***2 |
Cut error (mm) | ±1 | ±1 | ±1 | ±1 | ±1 |
Speed (m/min) | *****0 | ******0 | ******0 | *****0 | *********0 |
Main power (KW) |
4 | 7.5 | *5 | *2 | *7 |
Cutting motor (KW) | 3 | 4 | 4 | 7.5 | 7.5 |
Overall dimension (m) | 1.2*1*1.2 | 1.5×1.1×1.3 | 1.8×1.4×1.3 | *0×3×1.4 | *0×3×2 |
Weight (KG) | ***0 | ***0 | ***0 | ***0 | ***0 |
Model | TZ**3 | TZ**4 | TZ**6 | TZ**8 | TZ**9 |
Wire diameter (mm) | **3 | **4 | **6 | **8 | **9 |
Cut length (mm) | ******0mm | *******0mm | *******0mm | *******0mm | *******0mm |
Cut error (mm) | ±1 | ±1 | ±1 | ±1 | ±1 |
Speed (m/min) | <*0 | <*0 | <*0 | <*0 | <*0 |
Main power (KW) | 2.2 | 2.2 | 2.2 | 3 | 3 |
Cutting motor (KW) | 0.*5 | 0.*5 | 0.*5 | 1.1 | 1.1 |
Overall size (m) | 1.2*0.5*1.2 | 1.3*0.*5*1.2 | 1.4*0.6*1.2 | 1.5×0.*8×1.4 | 1.7×0.8×1.5 |
Weight (KG) | **0 | **0 | **0 | **0 | **0 |