タイトルまたは説明
Composed of hydraulic loading coil car, hydraulic decoiler, pinch
rollers, hydraulic shear, looping pit & bridge, side
guider, slitter, looping pit & bridge ,tension station,
hydraulic recoiler and hydraulic unloading coil car only
1) Specification of material:
(1) Raw material: Carbon steel coils, stainless steel, aluminium
(2) Thickness: 0.2 ~ 3.0 mm (Max.)
(3) Width: ***0 mm.
(4) Inside diameter **8 mm
(5) Outside diameter Max. 1,**0 mm.
(6) Coil weight: Max. *2 MT
2) Size of finished coil:
(1) Inside diameter: **8 mm
(2) Outside diameter: Max. 1,**0.
(3) Coil weight: Max.: *2 MT.
(4) Min slit width: *0 mm.
3) Line speed: 0~**0m/min
Main equipments:
1. Hydraulic loading coil car
2. Hydraulic decoiler (including hydraulic
supporting arm)
3. Peeler, pinch rollers, hydraulic shear
4. Looping pit & bridge
5. Manual side guider & pinch
rollers
6. Slitter
7. Conveyor frame & separate waste
rewinders (both sides)
8. Looping pit & bridge
9. Separating mechanism, tension station
*0. Separating equipment, hydraulic pull-off,
hydraulic recolier (including hydraulic supporting arm)
*1. Hydraulic unloading coil car
*2. Hydraulic system
*3. Electrical system
The proposed slitting line will function as longitude cutter to
slit jumbo coils into baby coils for final usage. In the
beginning, jumbo coil is loaded on the coil car by overhead crane
and brought to the decoiler by operating the coil car. Coil car
centralizes the coil under decoiler’s mandrel and the coil is
mounted on the decoiler. Mandrel is expanded. Snubber roll
rotates the coil. Peeler breaks the straps and brings the pre end
upto Pinch roll. The Pinch roll drives the coil end upto the
slitter. Then its drive is disconnected. Slitter moves the
slitted strips further. Slitted strips are threaded through loop
table and drag tension station into the recoiler’s drum. Recoiler
winds one turn on loose coil.Then drag tensioner and loop are put
into operation. Slitter and recoiler run simultaneously in
synchronization. As the coil build up, the recoiler rpm
correspondingly goes down to keep desired constant line speed.
This process goes on until the end of coil on decoiler. The
slitted coil is pushed on the exit coil car trolley through a
pusher plate operated by hydraulic cylinder. The side slitted
scrap is wound on the scrap winder units provided on both sides
of the slitter.
国: |
China |
モデル番号: |
HJ-FT-JB1400
|
离岸价格: |
120000 ~ 150000 / Set (交渉可能)
Get Latest Price
|
ロケーション: |
- |
最低注文量の価格: |
120000 per Set |
最低注文量: |
1 Set |
パッケージの詳細: |
protection film |
納期: |
120~130days |
供給能力: |
20 Set per Month |
支払いタイプ: |
L/C, T/T |
製品グループ : |
Slitting Line
|