タイトルまたは説明
product
character
A. bentonite
rubber waterstop is made of hydrophilic water expansion resin and
compound bentonite. The principle is that the hydrophilic part of
the rubber combine with water and
self-expansion
B. the
hydrophilic part of the water stop material will absorb water and
expand. The irregular expansion will fill the crack to stop
leaking
C. the
expansion rate is 3times, it can fill the crack completely and its
leak proof effect is good.
D. This
product does not contain harmful substance or heavy metal safe
construction and no pollution.
product function
1. concrete
second joint crack water stop material
2. middle
pile hole joint water stop material
3. steel
profile and concrete joint water stop
material
4. PVC
pipe, iron pipe and concrete joint water stop
material
5. kinds
of crack leaking water stop material
1. before pouring concrete in the
next section, has emerged the vertical (horizontal) or transverse
to the (Central) to the construction joints shall be installed with
water to the interface.
Installation Technology
Details 2
.how to fix water to take the lead board, they have under the
framework of the construction methods and machinery equipment
capacity to identify, can be nails, bolts or wire fixation. In
short its fixation by the construction workers to fully exercise
its imagination, to set aside groove convenient, fast, materials
and purposes. 3. a fixed water to be pasted in the construction
joint, the latter poured joint interface should be kept dry, flat
seam construction to eliminate the interface before the scum, dust
and debris.
4, water to install the site is
confirmed, the need to install the water to the interface and water
to the bottom are coated with a thin layer of adhesive, to be
volatile for some time before glue paste, or high strength screw
water to a fixed position in the established
installed.
5. In case of wet or uneven
concrete interface, fixed on the adhesive paste is not strong, the
visual condition with high-strength concrete nails to further
enhance fixation. Short water to be in close contact with the
concrete interface, fixed rate real, to prevent loss of water to
seepage from the interface and the
role.
6, with water to make the water
to locate installed by pouring concrete package, package
thickness> *0mm.
7, with water to extend the use
of joints used to connect overlapping methods lap, lapping paste
and then use high-strength outer nail fixed, the installation path
along the construction joint form a closed loop, during which
breakpoints can not stay.
8, water to locate the next one
after the pouring of concrete, should avoid being soaked in rain
and other water immersion.
9, pouring concrete vibrators
should be touched with water to avoid vibration
rods.
*0, with water to storage and
transport, avoid moisture and compressive
deformation.
国: |
China |
モデル番号: |
WS2520
|
离岸价格: |
(交渉可能)
Get Latest Price
|
ロケーション: |
China |
最低注文量の価格: |
- |
最低注文量: |
2000 Meter |
パッケージの詳細: |
blank carton |
納期: |
15days |
供給能力: |
1000000 Meter per Month |
支払いタイプ: |
T/T |
製品グループ : |
waterstop
|