离岸价格
Get Latest Price( Negotiable )
|500 Piece Minimum Order
国:
China
モデル番号:
-
离岸价格:
( Negotiable )Get Latest Price
ロケーション:
-
最低注文量の価格:
-
最低注文量:
500 Piece
パッケージの詳細:
WOODEN
納期:
25DAYS
供給能力:
5000 Piece per Month
支払いタイプ:
T/T, Western Union, Money Gram
製品グループ :
-
China
連絡先担当者 Baron
Jiya Industrial Park Dongpu Village, Dongguan, Guangdong
Mechanical parts processing technical
requirements for a summary outline of the processing parts: 1, did
not meet the requirements of GB******0 Note the shape of tolerance.
2, did not note the length dimension tolerance ± 0.5mm. 3, did not note radius R5. 4, are not
chamfer note C2. 5, acute blunt down. 6, sharp edges down blunt,
burr burr.
Parts
surface treatment:
1: On the part
machined surface, no defects scratches, abrasions and other damage
to parts of the surface.
2:There is no
thread surface machining black, bump, Labelling and burrs. All
parts need to be coated steel surface before painting must be rust,
scale, grease, dust, dirt, salt and dirt, etc.
Removed.
3:Before the
rust, first with an organic solvent, lye, emulsifier, steam and
other steel parts surface to remove grease, dirt.
4:The surface
to be coated and primed by shot peening or hand rust time interval
not more than 6h.
5Riveting
pieces mutual contact surfaces must be painted before connecting a
thickness of *0 ~ *0μm
rust. Lap edge applications of paint, putty or an adhesive closure.
Damage due to manufacturing or welding primer, to
re-painting.
Part of
the heat treatment:
1:After
quenching, HRC*0 ~ *5.
2:Carbon
steel: *5 or *0Cr parts for high-frequency quenching, **0 ~ **0
℃ tempering, HRC*0 ~
*5.
3:Carburizing
depth of 0.3mm.
4:High-temperature aging
treatment.
After
finishing technical requirements, the part is placed after
finishing shall not be placed directly on the ground, should take
the necessary support and protection measures.
2:Does not
allow machined surface rust and moth affect performance, or
appearance of life bump, scratches and other
defects.
3:Finishing
the rolling surface, without peeling after
rolling.
4:The final
step after the heat treatment of parts, there should be no surface
oxide.
After finishing the mating surfaces of the
tooth surface should have sealed annealing parts:
1:Must be
soaked in oil before each seal assembly.
2:Strict
inspection before assembly and cleared parts processing residual
acute angle, burrs and foreign matter. When load to ensure the seal
is not scratched.
3:The
adhesive should be cleared out of the excess
adhesive.
国: | China |
モデル番号: | - |
离岸价格: | ( Negotiable ) Get Latest Price |
ロケーション: | - |
最低注文量の価格: | - |
最低注文量: | 500 Piece |
パッケージの詳細: | WOODEN |
納期: | 25DAYS |
供給能力: | 5000 Piece per Month |
支払いタイプ: | T/T, Western Union, Money Gram |
製品グループ : | - |