离岸价格
Get Latest Price( Negotiable )
|500 Piece Minimum Order
国:
China
モデル番号:
-
离岸价格:
( Negotiable )Get Latest Price
ロケーション:
-
最低注文量の価格:
-
最低注文量:
500 Piece
パッケージの詳細:
WOODEN
納期:
25 DAYS
供給能力:
20000 Piece per Month
支払いタイプ:
T/T, Western Union
製品グループ :
-
China
連絡先担当者 Baron
Jiya Industrial Park Dongpu Village, Dongguan, Guangdong
Stainless steel processing difficulties
mainly in the following aspects:
1. Large cutting force, cutting temperature
is high. The large type material strength, shear stress when
cutting large plastic deformation, thus cutting power. Besides poor
thermal conductivity of the material, resulting in cutting
temperature and high temperature tend to be concentrated in a
narrow area near the edge of the tool, thereby speeding up the tool
wear.
2. Severe
hardening austenitic stainless steel as well as some
high-temperature alloys are austenitic stainless steel, cutting
work hardening tendency of large, usually a multiple of ordinary
carbon steel, tool hardening region in cutting tool life
shorten.
3.Easy to
stick the knife. Whether an austenitic stainless steel or
martensitic stainless steel are present when machining tough chips,
high cutting temperature characteristics. When passing through the
rake face tough chips, will produce bonding, welding, etc. stick
knife phenomenon, affecting the surface roughness of machined
parts.
4. The tool wear faster. The above materials
generally contain refractory elements, large plastic cutting
temperature is high, the tool wear rate, sharpening, tool change
frequently, thus affecting the efficiency of production, improve
the use of the tool costs.
国: | China |
モデル番号: | - |
离岸价格: | ( Negotiable ) Get Latest Price |
ロケーション: | - |
最低注文量の価格: | - |
最低注文量: | 500 Piece |
パッケージの詳細: | WOODEN |
納期: | 25 DAYS |
供給能力: | 20000 Piece per Month |
支払いタイプ: | T/T, Western Union |
製品グループ : | - |