あなたはまだ TradeKey.com のメンバーではないようです。 今すぐサインアップして、世界中で700万を超える輸入業者および輸出業者と接続します。
今すぐ加入、無料 |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
reusable plastic building construction formwork material
Next

reusable plastic building construction formwork material

离岸价格

Get Latest Price

18 ~ 38 / Piece

|

50 Piece Minimum Order

国:

China

モデル番号:

reusable plastic building construction formwork material

离岸价格:

18 ~ 38 / Piece Get Latest Price

ロケーション:

China

最低注文量の価格:

18 per Piece

最低注文量:

50 Piece

パッケージの詳細:

Carton and tray

納期:

5-10days

供給能力:

1000 Piece per Day

支払いタイプ:

T/T, L/C, Western Union, Money Gram, PayPal

今すぐお問い合わせください
無料会員

連絡先担当者 Ms. Luna

Jiaozuo, Henan

今すぐお問い合わせください

製品仕様

  • Place of Origin:Henan, China
  • Name:reusable plastic building construction formwork material
  • Application:Concrete Construction
  • Color:Black,Gray
  • Size:915mm*1830mm,1220mm*2440mm
  • Thickness:15mm-18mm
  • Material:PP plastic
  • Certificate:SGS

タイトルまたは説明

The building formwork is a temporary supporting structure, which is made according to the design requirements, so that the concrete structure and members are shaped according to the specified position and geometrical dimensions, maintaining their correct position, and bearing the self-weight of the building formwork and the external load acting on it. The purpose of the formwork project is to ensure the quality of concrete works and construction safety, speed up construction progress and reduce engineering costs.
The building formwork structure used for the construction of cast-in-place concrete structures is mainly composed of three parts: panel, support structure and connecting parts. The panel is a bearing plate directly contacting the newly poured concrete; the supporting structure is a temporary structure supporting the panel, the concrete and the construction load, ensuring that the building formwork structure is firmly combined so as not to be deformed or damaged; the connecting piece is the panel and the supporting The structure is connected into an integral fitting.

 


The raw materials for our products are PP plastic, fiberglass and calcium carbonate.In order to strength the plastic hardness, we add glassfiber in the raw materials, it will make the final products reuse longer time and make the surface to keep flat. 
 
The advantages of our plastic formwork:
1.Strong enough to resist the pressure or the weight of the fresh concrete plus any
constructional live loads.
2. Rigid enough to retain the shape without undue deformation.
3. Economical in terms of the total cost of the forms and the concrete surface finishing when required.
4. Sufficiently watertight to avoid leakage at the joints.They have impervious surfaces that usually create a smooth finish to the concrete. 

Plastic concrete formwork construction technology:
1. According to the engineering structure design drawing, the model design of the wall, column, beam and board is respectively carried out, and the specifications and quantity of the required plastic formwork and accessories are calculated.
2. Prepare a special construction plan for the formwork project.
3. Check the stiffness, strength and stability of the template and the bracket.
4. Formulate relevant measures to ensure the quality of the formwork, construction safety and plastic formwork management.
5. Develop the process flow of the mold and the mold removal.
 
Loads and pressures
1.Formwork itself, Live loads,Movement of equipment,Reinforcement weight, Fresh concrete weight, Additional loads e.g. forces originating from dumping of concrete, External factors e.g. action of wind
2.Unsymmetrical placement of concrete, Impact of concrete,Uplift
3. Shoring loads multi-storey buildings 
 

1.Q: Are you a factory or trading company?

A: We are a factory of reusable construction formwork material.

2.Q: How can I get some samples?

A: We are honored to offer you free samples.

3.Q: How does your factory control quality?

A: Quality is priority. We always control from the very beginning to the end , from the raw materials to the production. Every batch of materials, we must test the quality about the impact stength , Vicart , bending strength. Our factory has gained ISO***1:***8.

4.Q: How many times does your formwork reused?

A:It can be reused over *0 times.

5.Q: Does this formwork stick concrete? and easily remove or not?

A:It doesn't stick concrete and easily remove, even no need any release agent, only tapping can fallen off.

6.Q: How to clean the used formwork?

A: Only using the high-pressure water gun can make it clean.

7. Q: what are your foreigh markets?

A: Middle East countries, Africa countries, the eastern European countries,Oceania countries

 

国: China
モデル番号: reusable plastic building construction formwork material
离岸价格: 18 ~ 38 / Piece Get Latest Price
ロケーション: China
最低注文量の価格: 18 per Piece
最低注文量: 50 Piece
パッケージの詳細: Carton and tray
納期: 5-10days
供給能力: 1000 Piece per Day
支払いタイプ: T/T, L/C, Western Union, Money Gram, PayPal
製品グループ : plastic concrete building formwork

Send a direct inquiry to this supplier

To:

Ms. Luna < Henan Yaohang Alloy Formwork Co., Ltd >

私は知りたい: