タイトルまたは説明
The raw materials for our products are PP
plastic, fiberglass and calcium carbonate.In order to strength the
plastic hardness, we add glassfiber in the raw materials, it
will make the final products reuse longer time and make the
surface to keep flat.
The advantages of our plastic
formwork:
1.Strong
enough to resist the pressure or
the weight
of the fresh concrete plus any
constructional live loads.
2. Rigid enough to retain the shape
without undue
deformation.
3. Economical in terms of the total cost of
the forms and
the concrete surface finishing when
required.
4. Sufficiently watertight to avoid leakage
at the
joints.They have impervious surfaces that usually create a smooth
finish to the
concrete.
Plastic construction formwork is a kind
of energy-saving and green environmental protection product, pp
plastic combined with macromolecule nano-technology. Plastic
formwork is a new product after wood formwork, composite steel
formwork, bamboo-wood bonding formwork and all-steel large
formwork. Hollow plastic formwork is energy saving and
environmental protection,and can completely replace the traditional
steel formwork, wood formwork, square wood, What's more, its
amortization cost is very low.
Inspection method of Yaohang Hollow plastic
formwork:
1. Flexibility
test
Toughness test when the template is bent: Use
a forklift to crush the template that is not in the same plane (one
side is grounded, one side is placed obliquely), and the template
is intact without damage after rebound.
2.
Weight capacity detection
Use a small round head hammer to slam the
smooth surface of the plastic building template and observe the
surface depression. Good quality building templates will have
depressions, but there will be no cracks.
3.
Shrinkage test
The two templates are placed side by side on
the wooden board to record the gap distance between the two boards.
After two days and two nights, the difference is not more than
3mm*5mm compared with the previously measured
data.
4.
Nail-holding strength
Nail at a distance of 5 mm from the edge of
the plate. If there is no crack, this indicates that the quality of
the plate is good; after the nail is nailed, observing whether the
bonding state of the nail and the template is saturated and
tight.
FAQ
1.Q: Are you a factory or trading company?
A: We are a factory of reusable construction formwork
material.
2.Q: How can I get some samples?
A: We are honored to offer you free samples.
3.Q: How does your factory control quality?
A: Quality is priority. We always control from the very beginning
to the end , from the raw materials to the production. Every batch
of materials, we must test the quality about the impact stength ,
Vicart , bending strength. Our factory has gained
ISO***1:***8.
4.Q: How many times does your formwork reused?
A:It can be reused over *0 times.
5.Q: Does this formwork stick concrete? and easily remove or
not?
A:It doesn't stick concrete and easily remove, even no need any
release agent, only tapping can fallen off.
6.Q: How to clean the used formwork?
A: Only using the high-pressure water gun can make it
clean.
7. Q: what are your foreigh markets?
A: Middle East countries, Africa countries, the eastern European
countries,Oceania countries
国: |
China |
モデル番号: |
reusable plastic slab table formwork for construction project
|
离岸价格: |
18 ~ 38 / Piece (交渉可能)
Get Latest Price
|
ロケーション: |
China |
最低注文量の価格: |
18 per Piece |
最低注文量: |
50 Piece |
パッケージの詳細: |
cartons and pallet |
納期: |
5-15days |
供給能力: |
1000 Piece per Day |
支払いタイプ: |
T/T, L/C, Western Union, Money Gram, PayPal |
製品グループ : |
plastic concrete building formwork
|